Search Results - (( evolution optimization bat algorithm ) OR ( data implication scheduling algorithm ))

  • Showing 1 - 4 results of 4
Refine Results
  1. 1

    Multi-Swarm bat algorithm by Taha A.M., Chen S.-D., Mustapha A.

    Published 2023
    “…In this study a new Bat Algorithm (BA) based on multi-swarm technique called the Multi-Swarm Bat Algorithm (MSBA) is proposed to address the problem of premature convergence phenomenon. …”
    Article
  2. 2

    Quality of service and energy efficient aware (QEEA) scheduling algorithm for long term evolution (LTE) network / Nurulanis Mohd Yusoff by Mohd Yusoff, Nurulanis

    Published 2017
    “…Basically, the QEEA is based on the Time Domain (TD) and Frequency Domain (FD) scheduling where it is dependent on the QoS requirements to allocate resources. The proposed algorithm is compared against other scheduling algorithms, namely, the Channel and QoS Aware (CQA), Priority Set Scheduler (PSS), Proportional Fair (PF), Maximum Throughput (MT) and Blind Average Throughput (BAT). …”
    Get full text
    Get full text
    Thesis
  3. 3

    Enhancing project completion date prediction using a hybrid model: rule-based algorithm and machine learning algorithm by Abd Rahman, Mohd Shahrizan, Jamaludin, Nor Azliana Akmal, Zainol, Zuraini, Tengku Sembok, Tengku Mohd

    Published 2025
    “…The central purpose of this research is to significantly increase the predictability of these milestone dates, thereby eliminating the risks associated with high and dynamic fluctuations in schedules. The study employs a hybrid predictive model that combines Big Data technologies, Extract Load Transfer (ELT) processes, rule-based algorithms (RBA), machine learning (ML), and Power BI visualizations. …”
    Get full text
    Get full text
    Get full text
    Article
  4. 4

    Modelling of heuristic distribution algorithm to optimize flexible production scheduling in Indian industry by Reddy, Guduru Ramakrishna, Singh, Harpreet, Domeika, Aurelijus, Manoj Kumar, Nallapaneni, Quanjin, Ma

    Published 2020
    “…In the present work, Two Heuristic Algorithms are modelled and the best algorithm among those two Heuristics is selected after few comparisons 3M to 5M, this can optimize the scheduling processes up to 10x10 jobs i.e. 10 machines and 10 jobs. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item