Search Results - (( development time affection algorithm ) OR ( java application optimisation algorithm ))

Refine Results
  1. 1

    Study and Implementation of Data Mining in Urban Gardening by Mohana, Muniandy, Lee, Eu Vern

    Published 2019
    “…The system is essentially a three-part development, utilising Android, Java Servlets, and Arduino platforms to create an optimised and automated urban-gardening system. …”
    Get full text
    Get full text
    Get full text
    Article
  2. 2

    Web-based expert system for material selection of natural fiber- reinforced polymer composites by Ahmed Ali, Basheer Ahmed

    Published 2015
    “…Finally, the developed expert system was deployed over the internet with central interactive interface from the server as a web-based application. As Java is platform independent and easy to be deployed in web based application and accessible through the World Wide Web (www), this expert system can be one stop application for materials selection.…”
    Get full text
    Get full text
    Thesis
  3. 3

    Healthy Lifestyle Management System by Abu Bakar, Muhammad Syazwan

    Published 2011
    “…This project focuses on developing the intelligent algorithms to calculate and determines the duration of exercise, time to do exercise and the types of the exercise needed by a user daily. …”
    Get full text
    Get full text
    Final Year Project
  4. 4

    Investigating Inclusion of Safety Metrics for Safe Route Determination on Pedestrian Map by ONG, WEI HAN

    Published 2011
    “…To develop the safest route algorithm, it is important to research on the appropriate safety metrics that will be used to develop the safest route algorithm. …”
    Get full text
    Get full text
    Final Year Project
  5. 5

    An efficient real-time terrain data organization and visualization algorithm based on enhanced triangle-based level of detail technique by Zamri, Muhamad Najib

    Published 2006
    “…The proposed algorithm in this thesis is very practical in developing interactive graphics applications, which consider real-time rendering as one of the important elements.…”
    Get full text
    Get full text
    Thesis
  6. 6
  7. 7
  8. 8

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…Using the dynamic programming algorithm developed, the model was also able to recalculate alternative schedules by replacing unavailable teams with other teams to avoid delays. …”
    Get full text
    Get full text
    Thesis
  9. 9

    Real time nonlinear filtered-x lms algorithm for active noise control by Sahib, Mouayad Abdulredha

    Published 2012
    “…The developed THF-NLFXLMS algorithm is tested by means of simulation and implemented experimentally using FPGA-based real time controller for a nonlinear ANC application. …”
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11
  12. 12
  13. 13

    Monitoring the impacts of drought on land use/cover: a developed object-based algorithm for NOAA AVHRR time series data by Mokhtari, Ahmad, Mansor, Shattri, Mahmud, Ahmad Rodzi, Mohd Shafri, Helmi Zulhaidi

    Published 2011
    “…Primarily, raw weather data preparation activities were carried out to produce Standard Precipitation Index (SPI) spatial point thematic layer as a base map, then, satellite image pre-processing works applied on the remotely sensed data to generate the time series land use/cover maps. As a novel idea in this study, it developed a new object-based classification algorithm for AVHRR (Advanced Very High Resolution Radiometer) data. …”
    Get full text
    Get full text
    Get full text
    Article
  14. 14

    M-Factors Fuzzy Time Series for Forecasting Moving Holiday Electricity Load Demand in Malaysia (S/O 14589) by Mansor, Rosnalini, Mat Kasim, Maznah, Othman, Mahmod, Zaini, Bahtiar Jamili

    “…The modified algorithm, Weighted Subsethood Segmented Fuzzy Time Series (WeSuSFTS) consists of four main phases; data pre-processing, model development, model implementation and model evaluation. …”
    Get full text
    Get full text
    Monograph
  15. 15

    Reusability techniques in load-flow analysis computer program by Nor, K.M., Mokhlis, Hazlie, Gani, T.A.

    Published 2004
    “…Adding and changing codes and algorithm of the software can be done without affecting much the existing codes and algorithms. …”
    Get full text
    Get full text
    Article
  16. 16

    Semiparametric inference procedure for the accelarated failure time model with interval-censored data by Karimi, Mostafa

    Published 2019
    “…The rank-based methods, estimating algorithms, and resampling techniques that are developed do not involve the difficulties of the existing estimating procedures. …”
    Get full text
    Get full text
    Get full text
    Thesis
  17. 17

    Weighted subsethood and reasoning based fuzzy time series for moving holiday electricity load demand forecasting by Rosnalini, Mansor

    Published 2021
    “…The modified algorithm, Weighted Subsethood Segmented Fuzzy Time Series (WeSuSFTS) consists of four main phases; data pre-processing, model development, model implementation and model evaluation. …”
    Get full text
    Get full text
    Get full text
    Thesis
  18. 18

    New completion time algorithms for sequence based scheduling in multiproduct batch processes using matrix by Shafeeq , A., M.I., Abdul Mutalib, Amminudin , K.A., Muhammad , A.

    Published 2008
    “…All these parameters directly or indirectly affect the makespan, i.e. completion time of a batch process. …”
    Get full text
    Get full text
    Article
  19. 19

    Real-time measurement and gait detection algorithm for motion control of active ankle foot orthosis / Aminuddin Hamid by Hamid, Aminuddin

    Published 2015
    “…From the result analysis, the developed control algorithm shows that the realtime GRF measurement has the ability to enhance the AAFO functional performance and improve the patient gait.…”
    Get full text
    Get full text
    Thesis
  20. 20

    A genetic algorithm to minimise the maximum lateness on a single machine family scheduling problem by Lee, Lai Soon, Nazif, Habibeh

    Published 2009
    “…We will develop the proposed OCGA to solve the problem of minimising the total (weighted) completion time as future work. …”
    Get full text
    Conference or Workshop Item