Search Results - (( development program planning algorithm ) OR ( java data control algorithm ))

Refine Results
  1. 1

    Design Of Robot Motion Planning Algorithm For Wall Following Robot by Ali Hassan, Muhamad Khairul

    Published 2006
    “…Computer A will be sent the data to computer B through the internet/LAN using JAVA program. …”
    Get full text
    Get full text
    Monograph
  2. 2

    Automated time series forecasting by Ismail, Suzilah, Zakaria, Rohaiza, Tuan Muda, Tuan Zalizam

    Published 2011
    “…Moving Average, Decomposition, Exponential Smoothing, Time Series Regressions and ARIMA) were used.The algorithm was developed in JAVA using up to date forecasting process such as data partition, several error measures and rolling process.Successfully, the results of the algorithm tally with the results of SPSS and Excel.This automatic forecasting will not just benefit forecaster but also end users who do not have in depth knowledge about forecasting techniques.…”
    Get full text
    Get full text
    Get full text
    Monograph
  3. 3

    Café Web Based System Using Priority Scheduling Approach by Fatimah, Ghazali, Rohana, Ismail, Mohamad Hariz, Hasni

    Published 2017
    “…The priority scheduling algorithm is based on Control Processing Unit scheduling algorithm where it has a priority to execute tasks. …”
    Get full text
    Get full text
    Conference or Workshop Item
  4. 4

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…Using the dynamic programming algorithm developed, the model was also able to recalculate alternative schedules by replacing unavailable teams with other teams to avoid delays. …”
    Get full text
    Get full text
    Thesis
  5. 5
  6. 6

    MOTION PLANNING ALGORITHM FOR VEHICLE PARKING SIMULATION by Mohd Hilmi, Amirul Ehsan

    Published 2008
    “…This project focuses on creation of the motion planning algorithm of the system and developing a simulation to simulate the vehicle movements. …”
    Get full text
    Get full text
    Final Year Project
  7. 7

    Application of Shuffled Frog Leaping Algorithm (SFLA) to long term generation expansion planning / Nurul Ulya Ibrahim by Ibrahim, Nurul Ulya

    Published 2016
    “…The proposed SFLA in this study is developed using Matlab programming. This method is tested for 15 existing power plant and five generation candidates within 10 years of planning. …”
    Get full text
    Get full text
    Thesis
  8. 8
  9. 9

    Vision-based robot indoor navigation by Teo, Zhin Hang

    Published 2022
    “…An algorithm is developed in the computer to achieve image processing, user input, path planning, simulation, and writing of output files. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  10. 10

    A cluster-based hybrid replica control protocol for high availability in data grid by Mabni, Zulaile

    Published 2019
    “…Therefore, a replica control protocol must consider the dynamic aspects of the Data Grid. …”
    Get full text
    Get full text
    Thesis
  11. 11
  12. 12

    A bacteria foraging algorithm for solving integrated multi-period cell formation and subcontracting production planning in a dynamic cellular manufacturing system by Tang, Sai Hong, Nouri, Hossein, Motlagh, Omid Reza Esmaeili

    Published 2011
    “…This research aims to apply this emerging optimisation algorithm to develop a mixed-integer programming model for designing cellular manufacturing systems (CMSs), and production planning in dynamic environments. …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13

    Chaotic mutation immune evolutionary programming for photovoltaic planning in power system / Sharifah Azma Syed Mustaffa by Syed Mustaffa, Sharifah Azma

    Published 2020
    “…New automatic contingency analysis and ranking algorithm due to line and generator outages were separately developed considering the FVSI value. …”
    Get full text
    Get full text
    Thesis
  14. 14
  15. 15

    Development of a Production Planning and Control Software in Total Productivity Maintenance Environment by Lee, Pang Seng

    Published 2004
    “…A TPM based software program has been developed to ease the process of production planning and control in TPM environment by executing sequential methodology such as problem identification, literature review, problem formulation, data coliection, company operation review, flow chart system and program algorithm before test run in the company. …”
    Get full text
    Get full text
    Thesis
  16. 16
  17. 17
  18. 18

    Development of two matheuristics for production-inventory-distribution routing problem / Dicky Lim Teik Kyee by Dicky Lim , Teik Kyee

    Published 2018
    “…We propose an optimization algorithm designed by the interpolation of metaheuristics and mathematical programming techniques, known as MatHeuristics algorithm, to solve the model. …”
    Get full text
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20