Search Results - (( development program max algorithm ) OR ( java application path algorithm ))
Search alternatives:
- development program »
- java application »
- application path »
- path algorithm »
- max algorithm »
- program max »
-
1
An event-driven simulation for highest urgency first (HUF) : a latency and modulation aware bandwidth allocation algorithm for WiMAX base stations.
Published 2013“…Awide-spectrum of WiMAX simulators have been developed to provide analysis for advanced WiMAX system development, including the open source tool ns-2, and commercial software such as QualNet and OPNET Modeler. …”
Get full text
Get full text
Article -
2
Smart appointment organizer for mobile application / Mohd Syafiq Adam
Published 2009“…In creating this application, NetBeans IDE 6.5and Java Micro Edition (Java ME) are used. …”
Get full text
Get full text
Thesis -
3
Visdom: Smart guide robot for visually impaired people
Published 2025“…The system architecture integrates ROS 2 on a Raspberry Pi, with TCP/IP connectivity enabling remote operation. An Android mobile application, developed using Java and the java.net.Socket library, provides an intuitive and accessible user interface for seamless interaction with the robot. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
4
Designing and Developing an Intelligent Congkak
Published 2011“…and “Can Min-Max algorithm (MM) be speeded up by using NN as a forward-pruning method?”. …”
Get full text
Get full text
Get full text
Thesis -
5
CPLD based controller for single phase inverters
Published 2007“…A design and implementation of PWM by using complex programmable logic device (CPLD) from Altera MaxPlus II is constructed and programmed. The involved software, hardware, and suitable algorithm to implement and generate the PWM are developed in details. …”
Get full text
Get full text
Thesis -
6
CPLD based controller for single phase inverters
Published 2007“…A design and implementation of PWM by using complex programmable logic device (CPLD) from Altera MaxPlus II is constructed and programmed. The involved software, hardware, and suitable algorithm to implement and generate the PWM are developed in details. …”
Get full text
Get full text
Thesis -
7
SG-PBFS : Shortest Gap-Priority Based Fair Scheduling technique for job scheduling in cloud environment
Published 2024“…To address this issue, the main objective of this research is to improve the existing Priority Rules (PR) cloud schedulers by developing a new dynamic scheduling algorithm by manipulating the gaps in the cloud job schedule. …”
Get full text
Get full text
Get full text
Get full text
Article
