Search Results - (( development planning commitment algorithm ) OR ( java implementation phase algorithm ))

  • Showing 1 - 5 results of 5
Refine Results
  1. 1

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…All the algorithm for the engine has been developed by using Java script language. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Optimal route checking using genetic algorithm for UiTM's bus services / Tengku Salman Fathi Tengku Jaafar by Tengku Jaafar, Tengku Salman Fathi

    Published 2006
    “…Although from human logical thinking, the route can be generated easily but the calculation of checking the route whether it is optimal route or not is difficult and will take long time to be implemented. This research study with the development of the Optimal Route Checking Using Genetic Algorithm system should solve this scenario. …”
    Get full text
    Get full text
    Thesis
  3. 3

    UiTM Transportation Unit bus trip scheduling system / Noorzawanah Ab Rahim by Ab Rahim, Noorzawanah

    Published 2009
    “…Scheduling is committing resources to the realization of an event at a defined time, also committing resources to a plan. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Unit commitment in power system using multi-agent evolutionary programming incorporating priority listing optimisation technique / Muhammad Nazree Che Othman by Che Othman, Muhammad Nazree

    Published 2013
    “…In power system operation and planning study, the main platform in discussing this issue is referred as unit commitment (UC) problem. …”
    Get full text
    Get full text
    Thesis
  5. 5

    A review on artificial intelligence based load demand forecasting techniques for smart grid and buildings by Raza, M.Q., Khosravi, A.

    Published 2015
    “…Electrical load forecasting plays a vital role in order to achieve the concept of next generation power system such as smart grid, efficient energy management and better power system planning. As a result, high forecast accuracy is required for multiple time horizons that are associated with regulation, dispatching, scheduling and unit commitment of power grid. …”
    Get full text
    Get full text
    Article