Search Results - (( developing supplier selection algorithm ) OR ( java implication based algorithm ))

  • Showing 1 - 9 results of 9
Refine Results
  1. 1

    Supplier selection for contractors using Fuzzy TOPSIS Algorithm / Mohamed Shafiq Mohamed Yusof by Mohamed Yusof, Mohamed Shafiq

    Published 2020
    “…The main objective of this study is to develop a system which is supplier selection by using Fuzzy Technique of Order Preference Similarity to the Ideal Solution (Fuzzy TOPSIS). …”
    Get full text
    Get full text
    Thesis
  2. 2

    A Simulated Annealing Approach to Solve Fuzzy Multi-Objective Linear Model for Supplier Selection in a Supply Chain by Parthiban, P, Dominic P, Dhanapal Durai, dhanalakshmi, p

    Published 2010
    “…Supplier selection is a multiple criteria decision-making (MCDM) problem which is affected by several factors. …”
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3

    Development of integrated models for distribution network design of perishable products by Firoozi, Zahra

    Published 2015
    “…A Lagrangian relaxationbased heuristic algorithm is developed to solve the model. The algorithm produces solutions that are within 0.027% of optimality gap.…”
    Get full text
    Get full text
    Thesis
  4. 4
  5. 5
  6. 6

    Soft redundant instrument for metering station in gas transportation system by Rosli, N.S., Ibrahim, R., Ismail, I.

    Published 2015
    “…Accordingly, different ANN algorithms were investigated and compared to select a prediction model that provides the best performance. …”
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7

    Soft redundant instrument for metering station in gas transportation system by Rosli, N.S., Ibrahim, R., Ismail, I.

    Published 2015
    “…Accordingly, different ANN algorithms were investigated and compared to select a prediction model that provides the best performance. …”
    Get full text
    Get full text
    Conference or Workshop Item
  8. 8

    Development of a new approach for deterministic supply chain network design by Bidhandi, Hadi Mohammadi, Mohd. Yusuff, Rosnah, Megat Ahmad, Megat Mohamad Hamdan, Abu Bakar, Mohd Rizam

    Published 2008
    “…The model integrates location and capacity choices for suppliers, plants and warehouses selection, product range assignment and production flows. …”
    Get full text
    Get full text
    Get full text
    Article
  9. 9

    Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies by Taofeeq, D. M., Adeleke, A. Q., Lee, Chia Kuang

    Published 2020
    “…Purpose: The main parties in construction projects are the engineers, clients, architects, contractors, material suppliers, and consultants such as the project managers. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article