Search Results - (( developing selective max algorithm ) OR ( java estimation using algorithm ))

Refine Results
  1. 1

    Kernel and multi-class classifiers for multi-floor wlan localisation by Abd Rahman, Mohd Amiruddin

    Published 2016
    “…For fingerprint database optimisation, novel access point (AP) selection algorithms which are based on variant AP selection are investigated to improve computational accuracy compared to existing AP selection algorithms such as Max-Mean and InfoGain. …”
    Get full text
    Get full text
    Thesis
  2. 2

    A comparative evaluation of heuristic and metaheuristic job scheduling algorithms for optimized resource management in cloud environments by Haque, Najmul, Zafril Rizal, M. Azmi, Murad, Saydul Akbar

    Published 2026
    “…The selection of an appropriate scheduling algorithm is crucial for ensuring optimal performance, scalability, and resource efficiency as cloud environments become increasingly complex and dynamic. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3

    Individual And Ensemble Pattern Classification Models Using Enhanced Fuzzy Min-Max Neural Networks by F. M., Mohammed

    Published 2014
    “…Owing to a number of salient features which include the ability of learning incrementally and establishing nonlinear decision boundary with hyperboxes, the Fuzzy Min-Max (FMM) network is selected as the backbone for designing useful and usable pattern classification models in this research. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Simulation model to improve QoS performance over fixed WiMAX using OPNET by Lawal, I.A., Md Said, A., Mu'azu, A.A.

    Published 2013
    “…A Model was developed based on the proposed new distributed model (Master-Slave), the first scenario comprised of 3 Base Stations (BS) and thirty Subscriber Station (SS) with one Master BS selected by the designed algorithm (Nearest Neighborhood Algorithms). …”
    Get full text
    Get full text
    Article
  5. 5
  6. 6

    A new WDM Application Response Time in WLAN Network and Fixed WiMAX using Distributed by Nisar, K., Lawal, I.A., Abualsaud, K., El-Fouly, T.M.

    Published 2014
    “…Application Response Time is the key performance measure in WiMAX and WLAN Network Quality of Service (QoS). The WiMAX network does not provide sufficient QoS with respect to Application Response Time. …”
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7
  8. 8

    A new model of application response time for VoIP over WLAN and fixed WiMAX by Nisar, K., Hijazi, M.H.A., Lawal, I.A.

    Published 2015
    “…Worldwide Interoperability for Microwave Access (WiMAX) technology is also a preliminary step to develop Fourth Generation networks (4G) technologies. …”
    Get full text
    Get full text
    Conference or Workshop Item
  9. 9

    Multi-floor indoor location estimation system based on wireless local area network by Chua, Tien Han

    Published 2007
    “…The most probable match is selected and returned as estimated location based on Bayesian filtering algorithm. …”
    Get full text
    Get full text
    Thesis
  10. 10

    Ant colony optimization algorithm for load balancing in grid computing by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2012
    “…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization. …”
    Get full text
    Get full text
    Get full text
    Monograph
  11. 11

    Development of low power viterbi decoder on complex programmable logic device platform by Abu, Mohd Azlan

    Published 2018
    “…For the path metric updater unit (PMU), the traditional method of Viterbi algorithm is to store the selected minimum value of branch metric in the memory unit. …”
    Get full text
    Get full text
    Get full text
    Thesis
  12. 12
  13. 13

    Enhancement of Ant Colony Optimization for Grid Job Scheduling and Load Balancing by Husna, Jamal Abdul Nasir

    Published 2011
    “…A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against existing grid resource management algorithms such as Antz algorithm, Particle Swarm Optimization algorithm, Space Shared algorithm and Time Shared algorithm, in terms of processing time and resource utilization. …”
    Get full text
    Get full text
    Get full text
    Thesis
  14. 14
  15. 15

    Resource management in grid computing using ant colony optimization by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2011
    “…Resources with high pheromone value are selected to process the submitted jobs.Global pheromone update is performed after completion processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization.Experimental results show that EACO produced better grid resource management solution.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Monograph
  16. 16

    Estimation of dielectric constant for various standard materials using microstrip ring resonator by Low, Pek Jin, Esa, Fahmiruddin, You, Kok Yeow, Abbas, Zulkifly

    Published 2017
    “…The differences in frequency shift were used in NetBeans IDE 8.1 algorithm of Java for dielectric constant calculation. …”
    Get full text
    Get full text
    Article
  17. 17

    JTAGGER by YAACOB, NORHANA

    Published 2006
    “…In this project, rule-based tagging algorithm is used as the mechanism to develop the system which named JTagger. …”
    Get full text
    Get full text
    Final Year Project
  18. 18

    Visualisation tool to study malaria transmission using network modelling by Wong,, Ji Yeh

    Published 2014
    “…Java was used to implement the visualisation tool. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  19. 19
  20. 20

    A packet scheduling scheme for improving real-time applications performance in downlink LTE–advanced by Elsheikh, Elsheikh Mohamed Ahmed, Habaebi, Mohamed Hadi, Mohd Ramli, Huda Adibah, Arafa, Mohammed H. A., Ahmed, Kazi Istiaque

    Published 2018
    “…HARQ Aware Scheduling, Retransmission Aware Proportional Fair, Chase Combining Based Max C/I Scheduling and Maximum- Largest Weighted First (M-LWDF) are popular Packet Scheduling Algorithms (PSAs) developed to meet QoS requirements. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article