Search Results - (( developing integrity scheduling algorithm ) OR ( java implication based algorithm ))

Refine Results
  1. 1

    Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems by Umar, Umar Ali

    Published 2014
    “…The comparison of the result of the developed integrated algorithm using two benchmark FMS scheduling algorithms datasets is conducted. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Development of multi-objective optimization methods for integrated scheduling of handling equipment (AGVs, QCs, SP-AS/RS) in automated container terminals by Homayouni, Seyed Mahdi

    Published 2012
    “…Therefore, two meta-heuristic algorithms, namely genetic algorithm (GA) and simulated annealing (SA) algorithm, were developed to optimize the integrated scheduling of handling equipment. …”
    Get full text
    Get full text
    Thesis
  3. 3
  4. 4
  5. 5

    Energy Management in Integrated Microgrids: An Optimal Schedule Controller Utilizing Gradient Descent Algorithm by Abdolrasol M.G.M., Ker P.J., Hannan M.A., Ayob A., Tiong S.K.

    Published 2024
    “…Weather data, including wind, solar, fuel, and battery status, is integrated into the BGD algorithm for optimizing ON and OFF schedules. …”
    Conference Paper
  6. 6
  7. 7
  8. 8

    Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling by Ahmad, Siti Hasziani

    Published 2014
    “…In conclusion, the efficiency of the approach proposed is highly recommended for project managers in developing an effective schedule.…”
    Get full text
    Get full text
    Get full text
    Thesis
  9. 9

    Load-Balancing Models for Scheduling Divisible Load on Large Scale Data Grids by Abduh Kaid, Monir Abdullah

    Published 2009
    “…In addition, the integration of the proposed DLT model with Simulated Annealing (SA) algorithm has been also developed. …”
    Get full text
    Get full text
    Thesis
  10. 10

    Fair Traffic Scheduling and Shaping Algorithms for Diffserv Networks by Mohamed, Mohamed Awad Elshaikh

    Published 2006
    “…This thesis investigates the effect of different scheduling mechanisms and usage of a different marker algorithms then develop and implement a fair scheduling mechanism and integrate it with a shaper with the usage of a very fair efficient marker at the edge of the DiffServ networks with the usage of simulation and analytical techniques. …”
    Get full text
    Get full text
    Thesis
  11. 11
  12. 12

    Development of an integrated scheduling model for handling equipment in automated port container terminals by Sadeghian, Syed Hamidreza

    Published 2014
    “…As the integrated scheduling of handling equipment is a “non-deterministic polynomialtime hard” (NP-hard) problem and also the computation time and ease of application are so important for real practices of the scheduling methods, So a meta-heuristic algorithm based on Genetic Algorithm is developed, in which, new operators create solutions considering the constraints of the problem and also a heuristic rule proposed which assigns the ALVs to the tasks. …”
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14

    Ant colony optimization algorithm for dynamic scheduling of jobs in computational grid by Ku-Mahamud, Ku Ruhana, Ramli, Razamin, Yusof, Yuhanis, Mohamed Din, Aniza, Mahmuddin, Massudi

    Published 2012
    “…Job scheduling problem is classified as an NP-hard problem.Such a problem can be solved only by using approximate algorithms such as heuristic and meta-heuristic algorithms.Among different optimization algorithms for job scheduling, ant colony system algorithm is a popular meta-heuristic algorithm which has the ability to solve different types of NP-hard problems.However, ant colony system algorithm has a deficiency in its heuristic function which affects the algorithm behavior in terms of finding the shortest connection between edges.This research focuses on a new heuristic function where information about recent ants’ discoveries has been considered.The new heuristic function has been integrated into the classical ant colony system algorithm.Furthermore, the enhanced algorithm has been implemented to solve the travelling salesman problem as well as in scheduling of jobs in computational grid.A simulator with dynamic environment feature to mimic real life application has been development to validate the proposed enhanced ant colony system algorithm. …”
    Get full text
    Get full text
    Monograph
  15. 15

    An Optimized Binary Scheduling Controller for Microgrid Energy Management Considering Real Load Conditions by Mannan M., Roslan M.F., Reza M.S., Mansor M., Jern K.P., Hossain M.J., Hannan M.A.

    Published 2024
    “…To confirm the efficiency of the developed controller, a comparison is conducted between the results achieved with and without microgrid (MG) integration. …”
    Conference Paper
  16. 16
  17. 17

    Evaluate the performance of university timetabling problem with various artificial intelligence techniques by Hooi, Charmaine Wai Yee

    Published 2025
    “…The project focuses on developing an automated university course timetable scheduling tool using Genetic Algorithm (GA). …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  18. 18

    Resource scheduling algorithm with load balancing for cloud service provisioning by Priya, V., Sathiya Kumar, C., Kannan, R.

    Published 2019
    “…The objective of this work is to introduce an integrated resource scheduling and load balancing algorithm for efficient cloud service provisioning. …”
    Get full text
    Get full text
    Article
  19. 19
  20. 20

    Investigating the schedulability of periodic real-time tasks in virtualized cloud environment by Alhussian, H., Zakaria, N., Patel, A., Jaradat, A., Abdulkadir, S.J., Ahmed, A.Y., Bahbouh, H.T., Fageeri, S.O., Elsheikh, A.A., Watada, J.

    Published 2019
    “…The architecture integrated three modified soft real-time task scheduling algorithms, namely, Earliest Deadline First, Earliest Deadline until Zero-Laxity, and Unfair Semi-Greedy. …”
    Get full text
    Get full text
    Article