Search Results - (( developing green optimization algorithm ) OR ( java application optimization algorithm ))

Refine Results
  1. 1

    Web-based expert system for material selection of natural fiber- reinforced polymer composites by Ahmed Ali, Basheer Ahmed

    Published 2015
    “…As Java is platform independent and easy to be deployed in web based application and accessible through the World Wide Web (www), this expert system can be one stop application for materials selection.…”
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3

    Performance evaluation of real-time multiprocessor scheduling algorithms by Alhussian, H., Zakaria, N., Abdulkadir, S.J., Fageeri, S.O.

    Published 2016
    “…These results suggests that optimal algorithms may turn to be non-optimal when practically implemented, unlike USG which reveals far less scheduling overhead and hence could be practically implemented in real-world applications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  4. 4

    Route Optimization System by Zulkifli, Abdul Hayy

    Published 2005
    “…After much research into the many algorithms available, and considering some, including Genetic Algorithm (GA), the author selected Dijkstra's Algorithm (DA). …”
    Get full text
    Get full text
    Final Year Project
  5. 5

    Meta-heuristic structure for multiobjective optimization case study: Green sand mould system by Ganesan, T., Elamvazuthi, I., KuShaari, K.Z., Vasant, P.

    Published 2014
    “…By these procedures, a novel chaos-based metaheuristic algorithm, the Chaotic Particle Swarm (Ch-PSO) is developed. …”
    Get full text
    Get full text
    Book
  6. 6
  7. 7

    A Framework for Green Energy Resources Identification and Integration Supported by Real-Time Monitoring, Control, and Automation Applications by Far Chen, Jong

    Published 2025
    “…Sarawak is transitioning to green energy adoption, yet progress is hindered by a lack of comprehensive spatial data to identify optimal locations, inadequate optimization techniques for effective integration of these sites, and insufficient robust Industrial Internet of Things-based real-time monitoring and automation strategies to manage the intermittent nature of green energy resources. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  8. 8
  9. 9
  10. 10

    Analysis and modeling of database storage optimization power consumption usage for green data centers by Wan Noor Hamiza, Wan Ali

    Published 2014
    “…The proxies can be discovered by using a developed algorithm of functional dependencies (FDs) called as TANE algorithm. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  11. 11

    Normal-boundary intersection based parametric multi-objective optimization of green sand mould system by Ganesan, T., Vasant, P., Elamvazuthi, I.

    Published 2013
    “…This method then is used generate optimal solution options to the green sand mould system problem. …”
    Get full text
    Get full text
    Article
  12. 12

    Green network planning and operational power consumption optimization in LTE-A using artificial intelligence by Al-Samawi, Aida Ismail Ahmed

    Published 2015
    “…The second stage of the developed algorithm optimizes the average number of relay station per base station and their distance from the respective base station to meet the capacity constraint of the network operator. …”
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17

    Green scheduling algorithm for a computational grid environment by Haruna, A.A., Jung, L.T., Zakaria, M.N., Haron, N.S.

    Published 2016
    “…The experimental results significantly showed that the proposed green scheduling algorithm was able to save the consumption of cooling load by 22.02 in DC's server room. …”
    Get full text
    Get full text
    Conference or Workshop Item
  18. 18
  19. 19

    Self-configured link adaptation using channel quality indicator-modulation and coding scheme mapping with partial feedback for green long-term evolution cellular systems by Salman, Mustafa Ismael

    Published 2015
    “…Since the developed downlink scheduler and the partial feedback scheme affect the QoS, self-configured versions of both algorithms are developed to provide QoS provisioning. …”
    Get full text
    Get full text
    Thesis
  20. 20

    Computer Lab Timetabling Using Genetic Algorithm Case Study - Unit ICT by Abdullah, Amran

    Published 2006
    “…Genetic Algorithm is one of the most popular optimization solutions used in various applications such as scheduling. …”
    Get full text
    Get full text
    Thesis