Search Results - (( developing general permutation algorithm ) OR ( java implication based algorithm ))

  • Showing 1 - 10 results of 10
Refine Results
  1. 1

    The division free parallel algorithm for finding determinant by Karim, Sharmila, Omar, Zurni, Ibrahim, Haslinda

    Published 2013
    “…A cross multiplication method for determinant was generalized for any size of square matrices using a new permutation strategy.The permutation is generated based on starter sets.However, via permutation, the time execution of sequential algorithm became longer.Thus, in order to reduce the computation time, a parallel strategy was developed which is suited for master and slave paradigm of the high performance computer.A parallel algorithm is integrated with message passing interface.The numerical results showed that the parallel methods computed the determinants faster than the sequential counterparts particularly when the tasks were equally allocated.…”
    Get full text
    Get full text
    Get full text
    Article
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

    Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem by Sh Ahmad, Sh Salleh

    Published 2009
    “…Fourth, the Bottleneck Scheduling Performance (BSP) indexes introduced in the BAM heuristics procedure could be used to ascertain that some specific generated job arrangements are the optimum schedule. As a general conclusion, this research has achieved the objectives to develop bottleneck-based makespan algorithms and heuristics applicable for re-entrant flow shop environment. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis