Search Results - (( developing dynamic scheduling algorithm ) OR ( java implication drops algorithm ))

Refine Results
  1. 1

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…Using the dynamic programming algorithm developed, the model was also able to recalculate alternative schedules by replacing unavailable teams with other teams to avoid delays. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems by Umar, Umar Ali

    Published 2014
    “…The comparison of the result of the developed integrated algorithm using two benchmark FMS scheduling algorithms datasets is conducted. …”
    Get full text
    Get full text
    Thesis
  3. 3
  4. 4

    Hybrid ant colony system algorithm for static and dynamic job scheduling in grid computing by Alobaedy, Mustafa Muwafak Theab

    Published 2015
    “…A simulator called ExSim was developed to mimic the static and dynamic nature of the grid computing. …”
    Get full text
    Get full text
    Get full text
    Thesis
  5. 5

    Benchmark simulator with dynamic environment for job scheduling in grid computing by Ku-Mahamud, Ku Ruhana

    Published 2014
    “…Job scheduling algorithm has a significant influence on grid computing performance. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  6. 6

    Ant colony optimization algorithm for dynamic scheduling of jobs in computational grid by Ku-Mahamud, Ku Ruhana, Ramli, Razamin, Yusof, Yuhanis, Mohamed Din, Aniza, Mahmuddin, Massudi

    Published 2012
    “…Job scheduling problem is classified as an NP-hard problem.Such a problem can be solved only by using approximate algorithms such as heuristic and meta-heuristic algorithms.Among different optimization algorithms for job scheduling, ant colony system algorithm is a popular meta-heuristic algorithm which has the ability to solve different types of NP-hard problems.However, ant colony system algorithm has a deficiency in its heuristic function which affects the algorithm behavior in terms of finding the shortest connection between edges.This research focuses on a new heuristic function where information about recent ants’ discoveries has been considered.The new heuristic function has been integrated into the classical ant colony system algorithm.Furthermore, the enhanced algorithm has been implemented to solve the travelling salesman problem as well as in scheduling of jobs in computational grid.A simulator with dynamic environment feature to mimic real life application has been development to validate the proposed enhanced ant colony system algorithm. …”
    Get full text
    Get full text
    Monograph
  7. 7
  8. 8

    DESIGN AND EVALUATION OF RESOURCE ALLOCATION AND JOB SCHEDULING ALGORITHMS ON COMPUTATIONAL GRIDS by MEHMOOD SHAH, SYED NASIR

    Published 2012
    “…The issue is not only to develop new algorithms, but also to evaluate them on an experimental computational grid, using synthetic and real workload traces, along with the other existing job scheduling algorithms. …”
    Get full text
    Get full text
    Thesis
  9. 9

    A new priority rule cloud scheduling technique that utilizes gaps to increase the efficiency of jobs distribution by Saydul Akbar, Murad

    Published 2023
    “…To address this issue, the main objective of this research is to improve the existing PR cloud schedulers by developing a new dynamic scheduling algorithm by manipulating the gaps in the cloud job schedule. …”
    Get full text
    Get full text
    Thesis
  10. 10

    Dynamic key scheduling algorithm for block ciphers using quasigroup string transformation by Hassan Disina, Abdulkadir

    Published 2018
    “…This research proposed a Dynamic Key Scheduling Algorithm (KSA) using isotope of a quasigroup as the dynamic substitution table. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  11. 11

    Great Deluge and Extended Great Deluge based job scheduling in grid computing using GridSim by Seifaddini, Omid, Abdullah, Azizol, Muhammed, Abdullah, Hussin, Masnida

    Published 2016
    “…Many heuristic algorithms have been proposed for Grid scheduling to avail Grid computing. …”
    Get full text
    Get full text
    Get full text
    Book Section
  12. 12
  13. 13

    An FPGA implementation of exp-bet scheduling algorithm in LTE networks / Yusmardiah Yusuf by Yusuf, Yusmardiah

    Published 2017
    “…Since the implementation of scheduling algorithm is an open issue in LTE, many packet scheduling algorithms have been proposed by researchers. …”
    Get full text
    Get full text
    Thesis
  14. 14

    Hybrid dynamic scheduling model for flexible manufacturing system with machine availability and new job arrivals by Paslar, Shahla

    Published 2015
    “…The performance of the schedules as produced by the scheduling/rescheduling algorithms were investigated and compared. …”
    Get full text
    Get full text
    Thesis
  15. 15

    COMPARATIVE PERFORMANCE OF SOME HYBRID HEURISTICS SCHEDULING ALGORITHMS BASED ON SLTR AND DEADLINE FOR COMPUTATIONAL GRID by AHMED ABBA, HARUNA

    Published 2013
    “…Research on Grid scheduling focuses in solving three challenges: finding a good algorithm, automating the process, and developing a scalable, robust and efficient scheduling mechanism. …”
    Get full text
    Get full text
    Thesis
  16. 16

    A survey : particle swarm optimization-based algorithms for grid computing scheduling systems. by Ambursa, Faruku Umar, Latip, Rohaya

    Published 2013
    “…Bio-inspired heuristics have been promising in solving complex scheduling optimization problems. Several researches have been conducted to tackle the problems of task scheduling for the heterogeneous and dynamic grid systems using different bio-inspired mechanisms such as Genetic Algorithm (GA), Ant Colony Optimization (ACO), Particle Swarm Optimization (PSO). …”
    Get full text
    Get full text
    Get full text
    Article
  17. 17

    A modified shuffled frog leaping algorithm and its application to short-term hydrothermal scheduling / Mohamad Khairul Hakimi Abdul Hady by Abdul Hady, Mohamad Khairul Hakimi

    Published 2016
    “…This thesis discusses the solution of short-term hydrothermal scheduling problem using modified shuffled frog-leaping algorithm, which is inspired by the behavior of a group frog to find a place that has the most food optimization technique purpose that has been develop for solving the hydrothermal scheduling problem. …”
    Get full text
    Get full text
    Thesis
  18. 18

    A static jobs scheduling for independent jobs in Grid Environment by using Fuzzy C-Mean and Genetic algorithms by Lorpunmanee, Siriluck, Md. Sap, Mohd. Noor, Abdullah, Abdul Hanan, Srinoy, Surat

    Published 2006
    “…We present a static job scheduling algorithm by using Fuzzy C-Mean and Genetic algorithms. …”
    Get full text
    Get full text
    Conference or Workshop Item
  19. 19
  20. 20

    An enhanced ant colony system algorithm for dynamic fault tolerance in grid computing by Saufi, Bukhari

    Published 2020
    “…The proposed algorithm consists of dynamic evaporation rate, resource fitness-based scheduling process, enhanced pheromone update with trust factor and suspension, and checkpoint-based task reprocessing. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis