Search Results - (( developing cost construction algorithm ) OR ( java simulation optimization algorithm ))

Refine Results
  1. 1
  2. 2

    Enhancement of Ant Colony Optimization for Grid Job Scheduling and Load Balancing by Husna, Jamal Abdul Nasir

    Published 2011
    “…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources. A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against existing grid resource management algorithms such as Antz algorithm, Particle Swarm Optimization algorithm, Space Shared algorithm and Time Shared algorithm, in terms of processing time and resource utilization. …”
    Get full text
    Get full text
    Get full text
    Thesis
  3. 3

    Ant colony optimization algorithm for load balancing in grid computing by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2012
    “…The proposed algorithm is known as the enhance ant colony optimization (EACO). …”
    Get full text
    Get full text
    Get full text
    Monograph
  4. 4

    OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT by Murad S.S., Badeel R., Alsandi N.S.A., Alshaaya R.F., Ahmed R.A., Muhammed A., Derahman M.

    Published 2023
    “…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. …”
    Review
  5. 5

    Embedded system for indoor guidance parking with Dijkstra’s algorithm and ant colony optimization by Mohammad Ata, Karimeh Ibrahim

    Published 2019
    “…This study proposes a car parking management system which applies Dijkstra’s algorithm, Ant Colony Optimization (ACO) and Binary Search Tree (BST) in structuring a guidance system for indoor parking. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Features selection for intrusion detection system using hybridize PSO-SVM by Tabaan, Alaa Abdulrahman

    Published 2016
    “…Hybridize Particle Swarm Optimization (PSO) as a searching algorithm and support vector machine (SVM) as a classifier had been implemented to cope with this problem. …”
    Get full text
    Get full text
    Thesis
  7. 7

    Resource management in grid computing using ant colony optimization by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2011
    “…Resources with high pheromone value are selected to process the submitted jobs.Global pheromone update is performed after completion processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization.Experimental results show that EACO produced better grid resource management solution.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Monograph
  8. 8

    Implementation of locust inspired scheduling algorithm with huge number of servers for energy efficiency in a cloud datacenter by Azhar, Nur Huwaina

    Published 2019
    “…Cloudsim is used as Discrete Event Simulation tool and Java as coding language to evaluate LACE algorithm. …”
    Get full text
    Get full text
    Thesis
  9. 9

    Parameter estimation of cocomo model using the jaya algorithm for software cost estimation by Tan, Jie Chee

    Published 2019
    “…The Constructive Cost Model (COCOMO) is a procedural software cost estimation model developed by Barry W. …”
    Get full text
    Get full text
    Undergraduates Project Papers
  10. 10

    Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model by Abdullah, M.S., Alaloul, W.S., Liew, M.S., Musarat, M.A.

    Published 2021
    “…In spite of the development and innovation in the construction technologies, still, delay and cost overrun are the most crucial challenge of the construction industry in both developed and the developing countries. …”
    Get full text
    Get full text
    Article
  11. 11

    Strategies for effective value management practice in construction industry by Zulhkiple, A. Bakar

    Published 2017
    “…The objectives were to develop a new optimisation algorithm and apply the results to control construction project costs. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  12. 12

    Multi-base number representation in application to scalar multiplication and pairing computation by Mohammed Ismail, Abdelwahed

    Published 2011
    “…Multi-bases number representation is used to construct new versions of Miller’s algorithm. These algorithms are formulated for computing Tate and ate pairing. …”
    Get full text
    Get full text
    Thesis
  13. 13

    Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach by Gambo, Nuru, Said, Ilias, Ismail, Radzi

    Published 2016
    “… The technical performance requirements of projects posed a challenge to the sustainable development of small size local government projects particularly in developing countries. …”
    Get full text
    Get full text
    Get full text
    Article
  14. 14

    Development of a Negotiation Support Model for Value Management in Construction by UTOMO, CHRISTIONO

    Published 2009
    “…The research objectives are to find a theoretical basis and research approach for negotiation support methodology on VM, to develop a decision model for technical solution options in a satisfying function/cost preferences, to investigate negotiation style and outcome and analyze the correlation between them for the basis of scenarios on the agent system, to develop a model for agreement options and coalition algorithms on value-based decision, to validate the coalition algorithms and introduce an initial model of Negotiation Support for Value Management (NSVM). …”
    Get full text
    Get full text
    Final Year Project
  15. 15
  16. 16

    Imputing incomplete software metric database using iterative nearest neighbour based algorithm by Wasito, Ito, Ab. Azid, Nurul Farihan

    Published 2008
    “…Knowing the estimated cost at the early project would constitute so much to the software development cycle. …”
    Get full text
    Get full text
    Article
  17. 17

    Ant system with heuristics for capacitated vehicle routing problem by Tan, Wen Fang

    Published 2013
    “…The ASH algorithm is basically applied with its probabilistic decision rule and pheromone feedback to construct the sequences of customers to be visited in the CVRP solution. …”
    Get full text
    Get full text
    Thesis
  18. 18
  19. 19

    Software project estimation with machine learning by Zakaria, Noor Azura, Ismail, Amelia Ritahani, Yakath Ali, Afrujaan, Mohd Khalid, Nur Hidayah, Zainal Abidin, Nadzurah

    Published 2021
    “…It determines the budget, time and resources needed to develop a software project. One of the well-established software project estimation models is Constructive Cost Model (COCOMO) which was developed in the 1980s. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  20. 20

    Sports tournament scheduling using genetic algorithm / Hafeezur Syakir Abdul Motok@Mohd Ridzuan by Abdul Motok@Mohd Ridzuan, Hafeezur Syakir

    Published 2020
    “…The phase in RAD such as planning requirements, user design, rapid construction and cutover is used during development. …”
    Get full text
    Get full text
    Thesis