Search Results - (( developing consumer window algorithm ) OR ( java implementation modified algorithm ))
Search alternatives:
- implementation modified »
- developing consumer »
- java implementation »
- window algorithm »
-
1
Direct approach for mining association rules from structured XML data
Published 2012“…The thesis also provides a two different implementation of the modified FLEX algorithm using a java based parsers and XQuery implementation. …”
Get full text
Get full text
Thesis -
2
OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT
Published 2023“…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. The objectives of this work are: i) to provide a comprehensive review of the cloud and scheduling process; ii) to classify the scheduling strategies and scientific workflows; iii) to implement our proposed algorithm with various scheduling algorithms (i.e., Min-Min, Round-Robin, Max-Min, and Modified Max-Min) for performance comparison, within different cloudlet sizes (i.e., small, medium, large, and heavy) in three scientific workflows (i.e., Montage, Epigenomics, and SIPHT); and iv) to investigate the performance of the implemented algorithms by using CloudSim. …”
Review -
3
Prevention And Detection Mechanism For Security In Passive Rfid System
Published 2013“…The proposed protocol is designed with lightweight cryptographic algorithm, including XOR, Hamming distance, rotation and a modified linear congruential generator (MLCG). …”
Get full text
Get full text
Thesis -
4
Automatic generation of content security policy to mitigate cross site scripting
Published 2016“…It can be extended to support generating CSP for contents that are modified by JavaScript after loading. Current approach inspects the static contents of URLs.…”
Get full text
Get full text
Conference or Workshop Item -
5
Simulation of identifying shortest path walkway in library by using ant colony optimization
Published 2012“…Therefore,by determining the shortest path will help in reducing the time consume problem.This project is developed by starting with designing the workflow diagram as well as the design of the output interface.The work flow is the guide for the process of development.In between,Heuristic Approach is used to determine the entire possible paths at first,then Ant Colony Optimization algorithm will be implemented to search for the final and the shortest path. …”
Get full text
Get full text
Undergraduates Project Papers -
6
PCB defect detection system using run-length encoding
Published 2017“…In order to get the zero defect of the PCB, the automatic inspection has been developed for inspection of PCBs. One of the algorithm that has been built for inspections of PCB is template matching. …”
Get full text
Get full text
Student Project -
7
Adaptive persistence layer for synchronous replication (PLSR) in heterogeneous system
Published 2011“…The PLSR architecture model, workflow and algorithms are described. The PLSR has been developed using Java Programming language. …”
Get full text
Get full text
Thesis -
8
Development of some fast and efficient methods for elliptic curve scalar multiplication over prime fields
Published 2015“…At the scalar arithmetic level, we develop three new algorithms to accelerate the ECSM using the non adjacent form (NAF), window ω - non adjacent form (ω - NAF) and direct recoding method (DRM), by rewriting the scalar involved in ECSM. …”
Get full text
Get full text
Get full text
Thesis -
9
Challenges of hidden data in the unused area two within executable files
Published 2009“…Results: The programs were coded in Java computer language and implemented on Pentium PC. …”
Get full text
Get full text
Get full text
Article -
10
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
Published 2015“…Meanwhile, the second MAS model has been designed using two agents as follows: the first agent is a fault current agent that is to determine the fault current at all points before and after grounding; the second agent is the time operating of the agent which is used to determine the relay operating time before and after modifying fault current. The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
Get full text
Get full text
Thesis -
11
Evolutionary cost-cognizant regression test case prioritization for object-oriented programs
Published 2019“…There is also a need to consider implementing this strategy for dynamic object-oriented languages such as Python, Lisp, and Smalltalk.…”
Get full text
Get full text
Thesis
