Search Results - (( developing construction approach algorithm ) OR ( java implication based algorithm ))

Refine Results
  1. 1

    Ball surface representations using partial differential equations by Kherd, Ahmad Saleh Abdullah

    Published 2015
    “…Two specific Ball surfaces, namely harmonic and biharmonic, are first constructed in developing the proposed algorithm. The former and later surfaces require two and four boundary conditions respectively. …”
    Get full text
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3

    Dynamic Bayesian networks and variable length genetic algorithm for designing cue-based model for dialogue act recognition by Yahya, Anwar Ali, Mahmod, Ramlan, Ramli, Abd Rahman

    Published 2010
    “…The developed approach is evaluated against some of the previously used ranking approaches and the results provide experimental evidences on its ability to avoid the drawbacks of the ranking approaches. …”
    Get full text
    Get full text
    Article
  4. 4
  5. 5
  6. 6

    Development of a Negotiation Support Model for Value Management in Construction by UTOMO, CHRISTIONO

    Published 2009
    “…The methodology is based on a theoretical approach which consists of value-based decision nature in construction VM, multicriteria group decision making, game theory, negotiation theory, and agent-based development. …”
    Get full text
    Get full text
    Final Year Project
  7. 7

    A genetic algorithm approach to VLSI macro cell non-slicing floorplans using binary tree by Rahim At Samsuddin, H. A., Ab. Rahman, A. A. H., Andaljayalakshmi, G., Ahmad, R. B.

    Published 2008
    “…Experimental results on Microelectronics Center of North Carolina (MCNC) benchmark problems show that the developed algorithm achieves an acceptable performance quality to the slicing floorplan. …”
    Get full text
    Get full text
    Conference or Workshop Item
  8. 8

    Optimized feature construction methods for data summarizations of relational data by Sze, Florence Sia Fui

    Published 2014
    “…Many approaches have been developed to discover knowledge (i.e. useful information) from data stored in multiple tables in a relational database. …”
    Get full text
    Get full text
    Get full text
    Thesis
  9. 9
  10. 10
  11. 11
  12. 12

    Makespan algorithms and heuristic for internet-based collaborative manufacturing process using bottleneck approach by Bareduan, Sallehahmad, Hasan, Sulaiman

    Published 2010
    “…It was shown that using bottleneck-based analysis, effective makespan algorithms and constructive heuristic can be developed to solve for near-optimal scheduling sequence. …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13
  14. 14

    Developing triad design algorithms based on compatible factorization by Ibrahim, Haslinda, Omar, Zurni, Abdul Rahim, Rahela

    Published 2011
    “…These processes have helped us develop algorithm for triad design, the objective of this study.A new technique for triad design algorithm, known as Interval Generation Method was employed to construct TD(6n + 1) and TD(6n + 5).This method depends on analyzing the pattern of triples in the design to build starters.We begin by producing starters from Interval Generation Method as the initial block to begin with.Then the algorithm begins by cycling modular v from the initial block and finishes when the process approaches the initial block.The algorithms for TD(6n+1) and TD(6n+5) are presented in Chapter 4 and 5, respectively.As the entire study depends mainly on TD(v) algorithms, new and remarkable theorems and lemmas for TD(v) development are presented and proved.…”
    Get full text
    Get full text
    Get full text
    Monograph
  15. 15

    Examination timetabling using harmony search algorithm by Zainal Abidin, Muhamad Fauzi

    Published 2015
    “…The aim is to fulfil the hard constraints as well as the soft constraints to the highest grade possible in order to construct an optimum timetable. In this project, the Harmony Search Algorithm (HSA) has been applied to develop the examination timetable for Kolej Profesional MARA. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  16. 16
  17. 17

    Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach by Bareduan, Salleh Ahmad, Hasan, Sulaiman

    Published 2012
    “…Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck. …”
    Get full text
    Get full text
    Article
  18. 18

    A comparative study of clonal selection algorithm for effluent removal forecasting in septic sludge treatment plant by Ting, Sie Chun, Abdul Malik, Marlinda, Ismail, Amelia Ritahani

    Published 2015
    “…The development of effluent removal prediction is crucial in providing a planning tool necessary for the future development and the construction of a septic sludge treatment plant (SSTP), especially in the developing countries. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  19. 19
  20. 20