Search Results - (( developing based scheduling algorithm ) OR ( java application testing algorithm ))
Search alternatives:
- application testing »
- testing algorithm »
- developing based »
- based scheduling »
- java application »
-
1
Enhancement of Ant Colony Optimization for Grid Job Scheduling and Load Balancing
Published 2011“…A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against existing grid resource management algorithms such as Antz algorithm, Particle Swarm Optimization algorithm, Space Shared algorithm and Time Shared algorithm, in terms of processing time and resource utilization. …”
Get full text
Get full text
Get full text
Thesis -
2
Ant colony optimization algorithm for load balancing in grid computing
Published 2012“…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization. …”
Get full text
Get full text
Get full text
Monograph -
3
Smart appointment organizer for mobile application / Mohd Syafiq Adam
Published 2009“…In creating this application, NetBeans IDE 6.5and Java Micro Edition (Java ME) are used. …”
Get full text
Get full text
Thesis -
4
Resource management in grid computing using ant colony optimization
Published 2011“…Resources with high pheromone value are selected to process the submitted jobs.Global pheromone update is performed after completion processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization.Experimental results show that EACO produced better grid resource management solution.…”
Get full text
Get full text
Get full text
Get full text
Monograph -
5
Development of Simulated Annealing Based Scheduling Algorithm for Two Machines Flow Shop Problem
Published 2015“…Viewing as optimization problem and focusing on two machines, this research aims to develop a new Simulated Annealing based scheduling algorithm, called SA2M, for flow shop problem. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
6
AGENT MEETING SCHEDULER
Published 2011“…An agent meeting scheduler prototype then will be developed to prove that the selected algorithm is working properly. …”
Get full text
Get full text
Final Year Project -
7
A discrete event simulation framework for utility accrual scheduling algorithm in uniprocessor environment
Published 2011“…Approach: The study focused on the proposed and the development of an event based discrete event simulator for the existing General Utility Scheduling (GUS) to facilitate the reuse of the algorithm under a common simulation environment. …”
Get full text
Get full text
Get full text
Article -
8
A survey : particle swarm optimization-based algorithms for grid computing scheduling systems.
Published 2013“…Each scheduling algorithm is described and discussed under the suitable category.…”
Get full text
Get full text
Get full text
Article -
9
Scalable workflow scheduling algorithm for minimizing makespan and failure probability
Published 2019“…Based on the simulation results, the proposed algorithm has improved the overall workflow scheduling effectiveness in comparison with existing algorithms.…”
Get full text
Get full text
Get full text
Get full text
Article -
10
Priority hybrid and EEF uplink scheduling algorithm for IEEE 802.16E
Published 2013“…In this research the focus is on the WiMAX uplink traffic scheduling in the Point to Multipoint (PMP) mode. In this research, two algorithms tailored at enhancing the performance of hybrid algorithms in the WiMAX domains have been designed and developed. …”
Get full text
Get full text
Thesis -
11
Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems
Published 2014“…The comparison of the result of the developed integrated algorithm using two benchmark FMS scheduling algorithms datasets is conducted. …”
Get full text
Get full text
Thesis -
12
Development of dynamic programming algorithm for maintenance scheduling problem
Published 2020“…Then, from the model developed, a formulation was created based on the problem of the maintenance schedule proposed. …”
Get full text
Get full text
Thesis -
13
Great Deluge and Extended Great Deluge based job scheduling in grid computing using GridSim
Published 2016“…Many heuristic algorithms have been proposed for Grid scheduling to avail Grid computing. …”
Get full text
Get full text
Get full text
Book Section -
14
RSA Encryption & Decryption using JAVA
Published 2006“…The implementation of this project will be based on Rapid Application Design Methodology (RAD) and will be more focusing on research and finding, ideas and the implementation of the algorithm, and finally running and testing the algorithm. …”
Get full text
Get full text
Final Year Project -
15
Key schedule algorithm based on coordinate geometry of a three-dimensional hybrid cube
Published 2019“…This research proposed a new Key Schedule Algorithm based on the coordinate geometry of a Hybrid Cube (KSAHC) for the non-binary block cipher. …”
Get full text
Get full text
Get full text
Get full text
Thesis -
16
-
17
A discrete event simulation for utility accrual scheduling in uniprocessor environment
Published 2011“…This research has focused on the proposed and the development of an event based discrete event simulator for the existing General Utility Scheduling (GUS) to facilitate the reuse of the algorithm under a common simulation environment. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
18
A new priority rule cloud scheduling technique that utilizes gaps to increase the efficiency of jobs distribution
Published 2023“…To address this issue, the main objective of this research is to improve the existing PR cloud schedulers by developing a new dynamic scheduling algorithm by manipulating the gaps in the cloud job schedule. …”
Get full text
Get full text
Thesis -
19
Enhancement of Ant System Algorithm for Course Timetabling Problem
Published 2009“…This research starts with developing an algorithm based on original concept of Ant System Algorithm. …”
Get full text
Get full text
Get full text
Thesis -
20
