Search Results - (( construct solution based algorithm ) OR ( java data control algorithm ))
Search alternatives:
- construct solution »
- solution based »
- data control »
- java »
-
1
Efficient kerberos authentication scheme for cross-domain systems in industrial internet of things using ECC
Published 2021“…The offline scheme utilizes a Time-based One-Time Password (TOTP) algorithm to allow users to authenticate to the vehicle without needing an Internet connection once they have registered online when Internet access is available. …”
Get full text
Get full text
Thesis -
2
Design and statistical analysis of initial solution construction approach in curriculum based course timetabling problem
Published 2017“…This paper investigates the construction phase approach in which the sequential order of the courses/lectures applied several combination of graph heuristics to generate a population of initial solutions in curriculum-based course timetabling (CBCTT).The construction of population of initial solution is a prerequisite in a population-based metaheuristic implementation. …”
Get full text
Get full text
Conference or Workshop Item -
3
Design Of Robot Motion Planning Algorithm For Wall Following Robot
Published 2006“…Computer A will be sent the data to computer B through the internet/LAN using JAVA program. …”
Get full text
Get full text
Monograph -
4
Café Web Based System Using Priority Scheduling Approach
Published 2017“…The priority scheduling algorithm is based on Control Processing Unit scheduling algorithm where it has a priority to execute tasks. …”
Get full text
Get full text
Conference or Workshop Item -
5
Utilizing the roulette wheel based social network search algorithm for substitution box construction and optimization
Published 2023“…This paper introduces a new variant of a recent metaheuristic algorithm based on the Social Network Search algorithm (SNS), which is called the Roulette Wheel Social Network Search algorithm (SNS). …”
Get full text
Get full text
Get full text
Get full text
Article -
6
A hybrid adaptive harmony search with modified great deluge algorithm for school timetabling
Published 2025“…In Phase 1, heuristic rules refine the time assignment stage to improve an existing construction algorithm. Phase 2 adaptively tunes parameters based on iteration position, solution number, behavioral status, and parameter linkages. …”
Get full text
Get full text
Thesis -
7
Enhanced Intelligent Water Drops Algorithm for University Examination Timetabling Problems
Published 2024“…(iii) It is a constructive-based meta-heuristic algorithm which means, the solution is incrementally constructed (step by step) until the complete solution is obtained (Noferesti and Shah-Hosseini, 2012). …”
thesis::doctoral thesis -
8
A random search based effective algorithm for pairwise test data generation
Published 2011Get full text
Get full text
Get full text
Conference or Workshop Item -
9
Automated time series forecasting
Published 2011“…Moving Average, Decomposition, Exponential Smoothing, Time Series Regressions and ARIMA) were used.The algorithm was developed in JAVA using up to date forecasting process such as data partition, several error measures and rolling process.Successfully, the results of the algorithm tally with the results of SPSS and Excel.This automatic forecasting will not just benefit forecaster but also end users who do not have in depth knowledge about forecasting techniques.…”
Get full text
Get full text
Get full text
Monograph -
10
A cluster-based hybrid replica control protocol for high availability in data grid
Published 2019“…Therefore, a replica control protocol must consider the dynamic aspects of the Data Grid. …”
Get full text
Get full text
Thesis -
11
Sequential constructive algorithm incorporate with fuzzy logic for solving real world course timetabling problem
Published 2020“…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
12
Harmony annealing algorithm for curriculum-based course timetabling problem
Published 2012“…An attempt to solve these problems was made via an approach broken down into two parts; first, constructive algorithm with saturation degree approach was used to ensure a feasible solution, where the hard constraints are satisfied.Secondly, Harmony annealing algorithm was used to further improve the results obtained.The algorithm produced results that were not comparatively better than those previously known as best solution.With proper modification in terms of the approach in this algorithm would make the algorithm perform better on curriculum-based course timetabling.…”
Get full text
Get full text
Get full text
Conference or Workshop Item -
13
Construction of initial solution population for curriculum-based course timetabling using combination of graph heuristics
Published 2016“…The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution.This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions.The graph heuristics were set as single and combination of two heuristics.In addition, several ways of assigning courses into room and timeslot are implemented.All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced.The result shows that combination of largest degree followed by saturation degree heuristic produce the highest number of population of initial solutions.The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions…”
Get full text
Get full text
Get full text
Article -
14
Enhancing the Sorting Layers in the Initial Stage of High School Timetabling
Published 2020“…KHE is an algorithm that generates initial solution of HSTP. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
15
-
16
Sequential Constructive Algorithm incorporate with Fuzzy Logic for Solving Real World Course Timetabling Problem
Published 2020“…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
Get full text
Get full text
Get full text
Get full text
Get full text
Book -
17
Integrated optimal control and parameter estimation algorithms for discrete-time nonlinear stochastic dynamical systems
Published 2011“…In this work, a simplified model-based optimal control model with adjustable parameters is constructed. …”
Get full text
Get full text
Thesis -
18
Biometric identification with limited data set
Published 2019Get full text
Get full text
Get full text
Get full text
Proceeding Paper -
19
Constructing population of initial solutions for curriculum – based course timetabling problem
Published 2012“…Future work will use the best settings of heuristics to the improvement phase in population-based improvement algorithm.…”
Get full text
Get full text
Conference or Workshop Item -
20
Automated multi-agent negotiation framework for the construction domain
Published 2023Conference Paper
