Search Results - (( basic objective scheduling algorithm ) OR ( java implementation modified algorithm ))

Refine Results
  1. 1

    Direct approach for mining association rules from structured XML data by Abazeed, Ashraf Riad

    Published 2012
    “…The thesis also provides a two different implementation of the modified FLEX algorithm using a java based parsers and XQuery implementation. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Scheduling scientific workflow using multiobjective algorithm with fuzzy resource utilization in multi-cloud environment by Farid, Mazen, Latip, Rohaya, Hussin, Masnida, Abdul Hamid, Nor Asilah Wati

    Published 2020
    “…In this respect, this paper proposes a new multi-objective scheduling algorithm with Fuzzy resource utilization (FR-MOS) for scheduling scientific workflow based on particle swarm optimization (PSO) method. …”
    Get full text
    Get full text
    Article
  3. 3

    A preemptive utility accrual scheduling algorithm in adaptive real time system. by Ahmad, Idawaty, Subramaniam, Shamala, Othman, Mohamed, Othman, Muhammad Fauzan

    Published 2008
    “…In this paper, we propose a preemptive utility accrual scheduling(or PUAS) algorithm as an enhancement to General Utility Scheduling ( or GUS) algorithm proposed by Peng Li [1]. …”
    Get full text
    Get full text
    Article
  4. 4

    Hybrid-discrete multi-objective particle swarm optimization for multi-objective job-shop scheduling by Anuar, Nurul Izah

    Published 2022
    “…Many real-world production scheduling problems involve the simultaneous optimization of multiple conflicting objectives that are challenging to solve without the aid of powerful optimization techniques. …”
    Get full text
    Get full text
    Get full text
    Thesis
  5. 5

    UiTM Transportation Unit bus trip scheduling system / Noorzawanah Ab Rahim by Ab Rahim, Noorzawanah

    Published 2009
    “…Other than that, generated scheduling manually will cost a lot of time. The objective is to generate a prototype bus trip scheduling system that can schedule the bus trips transportation efficiently. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches by Mohd Pauzi, Nur Fazlinda

    Published 2015
    “…The main objective of this research is to develop a computer program with capability of manipulating the onlooker bee approaches in ABC Algorithm for solving flowshop scheduling problem. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  7. 7

    OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT by Murad S.S., Badeel R., Alsandi N.S.A., Alshaaya R.F., Ahmed R.A., Muhammed A., Derahman M.

    Published 2023
    “…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. The objectives of this work are: i) to provide a comprehensive review of the cloud and scheduling process; ii) to classify the scheduling strategies and scientific workflows; iii) to implement our proposed algorithm with various scheduling algorithms (i.e., Min-Min, Round-Robin, Max-Min, and Modified Max-Min) for performance comparison, within different cloudlet sizes (i.e., small, medium, large, and heavy) in three scientific workflows (i.e., Montage, Epigenomics, and SIPHT); and iv) to investigate the performance of the implemented algorithms by using CloudSim. …”
    Review
  8. 8

    Prevention And Detection Mechanism For Security In Passive Rfid System by Khor, Jing Huey

    Published 2013
    “…The proposed protocol is designed with lightweight cryptographic algorithm, including XOR, Hamming distance, rotation and a modified linear congruential generator (MLCG). …”
    Get full text
    Get full text
    Thesis
  9. 9

    Automatic generation of content security policy to mitigate cross site scripting by Mhana, Samer Attallah, Din, Jamilah, Atan, Rodziah

    Published 2016
    “…It can be extended to support generating CSP for contents that are modified by JavaScript after loading. Current approach inspects the static contents of URLs.…”
    Get full text
    Get full text
    Conference or Workshop Item
  10. 10

    Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem by Sh Ahmad, Sh Salleh

    Published 2009
    “…As a general conclusion, this research has achieved the objectives to develop bottleneck-based makespan algorithms and heuristics applicable for re-entrant flow shop environment. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  11. 11

    Optimization of Upstream Offshore Oilfield Production Planning under Uncertainty and Downstream Crude Oil Scheduling at Refinery Front-End by Tan Yin Keong, Tan Yin

    Published 2012
    “…The second part is on the scheduling of crude oil operations at a refinery front-end. …”
    Get full text
    Get full text
    Final Year Project
  12. 12
  13. 13

    Bottleneck-based heuristic for permutation flowshop scheduling by Isa, Noor Amira

    Published 2017
    “…Thus, the main objective of this study are to propose and develop a new heuristic for solving permutation flowshop scheduling by considering four-machines and n-jobs (n = 6, 10, 15, 20). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  14. 14

    Adaptive persistence layer for synchronous replication (PLSR) in heterogeneous system by Beg, Abul Hashem

    Published 2011
    “…The PLSR architecture model, workflow and algorithms are described. The PLSR has been developed using Java Programming language. …”
    Get full text
    Get full text
    Thesis
  15. 15

    Development of a Production Planning and Control Software in Total Productivity Maintenance Environment by Lee, Pang Seng

    Published 2004
    “…One of the approaches for improving the performance of both production and maintenance is by developing and implementing a Total Productive Maintenance (TPM) strategy. The main objectives for this study is to develop a production planning and control (PPC) software in a TPM environment for a manufacturing company and improve the overall production planning and control system from manual recording to computer aided recording which includes some planning features such as Master Production Scheduling (MPS), monthly capacity planning, operation scheduling and other requirements. …”
    Get full text
    Get full text
    Thesis
  16. 16

    A study on personalized recommender system using social media by Aishnivya, Balamurugan

    Published 2020
    “…These machine learning algorithm processes the data set obtained. The evaluation on these algorithm is done to evaluate accuracy of the algorithm. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  17. 17

    Unit commitment in power system using multi-agent evolutionary programming incorporating priority listing optimisation technique / Muhammad Nazree Che Othman by Che Othman, Muhammad Nazree

    Published 2013
    “…The developed technique was tested on the 10 generating units test system then up to 20 generating units in a 24-hours scheduling period and the results was compared with the basic EP, Evolutionary Programming with Priority Listing (EP-PL) and Multi-agent Evolutionary Programming (MAEP) optimisation techniques. …”
    Get full text
    Get full text
    Thesis
  18. 18

    Challenges of hidden data in the unused area two within executable files by Naji, Ahmed Wathik, Zaidan, A.A., Zaidan, B.B.

    Published 2009
    “…Results: The programs were coded in Java computer language and implemented on Pentium PC. …”
    Get full text
    Get full text
    Get full text
    Article
  19. 19
  20. 20

    Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection by Nadheer Abdulridha, Shalash

    Published 2015
    “…Meanwhile, the second MAS model has been designed using two agents as follows: the first agent is a fault current agent that is to determine the fault current at all points before and after grounding; the second agent is the time operating of the agent which is used to determine the relay operating time before and after modifying fault current. The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
    Get full text
    Get full text
    Thesis