Search Results - (( based contractors method algorithm ) OR ( using codification using algorithm ))
Search alternatives:
- contractors method »
- using codification »
- codification using »
- based contractors »
- method algorithm »
- using algorithm »
-
1
The Determination of Pile Capacity Using Artificial Neural-net: An Optimization Approach
Published 2001“…Using the developed algorithm, the safety measures involved are such as reliability index and the probability of failure; instead of only factor of safety if conventional deterministic approach is used. …”
Get full text
Get full text
Article -
2
Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies
Published 2020“…This study uses the quantitative method to identify the individual factors influencing contractors’ risk attitude and the moderating role of government policy among construction companies in Malaysia. …”
Get full text
Get full text
Get full text
Get full text
Article -
3
An optimum drill bit selection technique using artificial neural networks and genetic algorithms to increase the rate of penetration
Published 2018“…This paper discusses bit selection by employing a method of combining Artificial Neural Network (ANN) and the computation of Genetic Algorithm (GA). …”
Get full text
Get full text
Article -
4
Real-Time Detection of Personal Protective Equipment for Site Safety Using Deep Learning Techniques
Published 2022“…This paper presents a deep learning technique for detecting multiple personal protection equipment at once based on You-Only-Look-Once Version 4 (YOLOv4) object detection algorithm. …”
Get full text
Get full text
Undergraduates Project Papers -
5
Pile Capacity Checking Tool based on Distributed Fibre Optic Sensing for Instrumented Pile Load Test
Published 2023Get full text
Get full text
Conference or Workshop Item -
6
Discriminative feature representation for Malay children’s speech recognition / Seyedmostafa Mirhassani
Published 2015“…In case of multiple filterbanks the cepstral features are used in different experts for performing classification based on different representation of speeches. …”
Get full text
Get full text
Thesis -
7
Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach
Published 2016“…Survey instruments were administered to major stakeholders in the construction industry comprising of project clients, contractors and consultants using proportionate stratified random sampling method. …”
Get full text
Get full text
Get full text
Article -
8
Time-Uncertainty Analysis by Using Simulation in Project Scheduling Networks
Published 1999“…The merge event bias as one of the essential problems associated with PERT is discussed, along with models and approaches developed by other researchers, namely, Probabilistic Network Evaluation Technique (PNET algorithm), Modified PNET, Back-Forward Uncertainly Estimation procedure (BFUE) and concept based on the robust reliability idea. …”
Get full text
Get full text
Thesis
