Search Results - (( a distribution computer algorithm ) OR ( parameter optimization method algorithm ))

Refine Results
  1. 1
  2. 2

    Fair bandwidth distribution marking and scheduling algorithm in network traffic classification by Al-Kharasani, Ameen Mohammed Abdulkarem

    Published 2019
    “…Finally, propose a new method of obtaining optimal parameters dropping functions for Random Early Detection (RED) algorithm. …”
    Get full text
    Get full text
    Thesis
  3. 3
  4. 4

    Abnormalities and fraud electric meter detection using hybrid support vector machine & genetic algorithm by Yap K.S., Abidin I.Z., Ahmad A.R., Hussien Z.F., Pok H.L., Ismail F.I., Mohamad A.M.

    Published 2023
    “…It provides an increased convergence and globally optimized solutions. The algorithm has been tested using actual customer consumption data from SESB. 10 fold cross validation method is used to confirm the consistency of the detection accuracy. …”
    Conference Paper
  5. 5

    Optimization of PID parameters for hydraulic positioning system utilizing variable weight Grey-Taguchi and particle swarm optimization by Nur Iffah, Mohamed Azmi

    Published 2014
    “…Particle swarm optimization algorithm (PSO) is one of the artificial intelligence methods. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Comprehensive power restoration approach using rule-based method for 11kV distribution network by Khalid A.R., Ahmad S.M.S., Shakil A., Pa N.N., Shafie R.M.

    Published 2023
    “…This paper presents a restoration algorithm based on a Rule-Based approach. …”
    Conference Paper
  7. 7
  8. 8

    DESIGN AND EVALUATION OF RESOURCE ALLOCATION AND JOB SCHEDULING ALGORITHMS ON COMPUTATIONAL GRIDS by MEHMOOD SHAH, SYED NASIR

    Published 2012
    “…The four prime aspects of this work are: firstly, a model of the grid scheduling problem for dynamic grid computing environment; secondly, development of a new web based simulator (SyedWSim), enabling the grid users to conduct a statistical analysis of grid workload traces and provides a realistic basis for experimentation in resource allocation and job scheduling algorithms on a grid; thirdly, proposal of a new grid resource allocation method of optimal computational cost using synthetic and real workload traces with respect to other allocation methods; and finally, proposal of some new job scheduling algorithms of optimal performance considering parameters like waiting time, turnaround time, response time, bounded slowdown, completion time and stretch time. …”
    Get full text
    Get full text
    Thesis
  9. 9
  10. 10

    Automated-tuned hyper-parameter deep neural network by using arithmetic optimization algorithm for Lorenz chaotic system by Nurnajmin Qasrina Ann, ., Pebrianti, Dwi, Mohammad Fadhil, Abas, Bayuaji, Luhur

    Published 2023
    “…This study proposes an automated-tuned hyper-parameter for DNN using a metaheuristic optimization algorithm, arithmetic optimization algorithm (AOA). …”
    Get full text
    Get full text
    Get full text
    Article
  11. 11
  12. 12

    Automated-tuned hyper-parameter deep neural network by using arithmetic optimization algorithm for Lorenz chaotic system by Ayop Azmi, Nurnajmin Qasrina Ann, Pebrianti, Dwi, Abas, Mohammad Fadhil, Bayuaji, Luhur

    Published 2023
    “…This study proposes an automated-tuned hyper�parameter for DNN using a metaheuristic optimization algorithm, arithmetic optimization algorithm (AOA). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  13. 13
  14. 14

    Nomadic people optimizer (NPO) for large-scale optimization problems by Mohamd Salih, Sinan Qahtan

    Published 2019
    “…Researchers have in the past few decades resorted to several methods that are inspired from complex optimization problems. …”
    Get full text
    Get full text
    Thesis
  15. 15

    Estimation of transformers health index based on condition parameter factor and hidden Markov model by Mohd Selva, Amran, Yahaya, Muhammad Sharil, Azis, Norhafiz, Ab Kadir, Mohd Zainal Abidin, Jasni, Jasronita, Yang Ghazali, Young Zaidey

    Published 2018
    “…Subsequently, the future states probability distribution was computed based on the HMM prediction model and viterbi algorithm was applied to find the best optimal path sequence of HI for the respective observable condition. …”
    Get full text
    Get full text
    Conference or Workshop Item
  16. 16
  17. 17

    Defect recognition method for magnetic leakage detection in oil and gas steel pipes based on improved neural networks by Wang Jie, Mohd. Kamal Mohd. Shah, Choong Wai Heng, Nahiyan Al-Azad

    Published 2024
    “…To enhance the accuracy of predicting pipeline defect sizes, this study introduces a magnetic leakage detection system, employing Backpropagation (BP) neural networks optimized with genetic algorithms. Traditional BP networks face challenges, including parameter determination and slow convergence, addressed through genetic algorithms' global search capabilities. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  18. 18

    Independent task scheduling algorithms in fog environments from users’ and service providers’ perspectives: a systematic review by Al-Qadhi, Abdulrahman K., Latip, Rohaya, Chiong, Raymond, Athauda, Rukshan, Hussin, Masnida

    Published 2025
    “…To address these issues, a substantial amount of work has been done to determine optimal methods to improve QoS using task scheduling algorithms. …”
    Get full text
    Get full text
    Get full text
    Article
  19. 19

    Development of integrated models for distribution network design of perishable products by Firoozi, Zahra

    Published 2015
    “…A Lagrangian relaxationbased heuristic algorithm is developed to solve the model. The algorithm produces solutions that are within 0.027% of optimality gap.…”
    Get full text
    Get full text
    Thesis
  20. 20

    A predictive approach to improve a fault tolerance confidence level on grid resources scheduling by Bouyer, Asgarali, Md. Sap, Mohd. Noor

    Published 2008
    “…Many methods are presented in a few years ago, but in these algorithms, some parameters such as job requirements and clear predictor method are not truly considered and also some methods apply optimistic view in grid scheduling cycle. …”
    Get full text
    Get full text
    Article