Search Results - (( _ construction waste algorithm ) OR ( java application mining algorithm ))

Refine Results
  1. 1
  2. 2
  3. 3

    Study and Implementation of Data Mining in Urban Gardening by Mohana, Muniandy, Lee, Eu Vern

    Published 2019
    “…Attached sensors generate data and send these data to the Java Servlet application through a WIFI module. These data are processed and stored in appropriate formats in a MySQL server database. …”
    Get full text
    Get full text
    Get full text
    Article
  4. 4

    Mining Sequential Patterns Using I-PrefixSpan by Dhany , Saputra, Rambli Dayang, R.A., Foong, Oi Mean

    Published 2007
    “…Sequential pattern mining is a relatively new data-mining problem with many areas of application. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  5. 5

    A web-based implementation of k-means algorithms by Lee, Quan

    Published 2022
    “…This stinginess of proximity measures in data mining tools is stifling the performance of the algorithm. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  6. 6
  7. 7

    Features selection for intrusion detection system using hybridize PSO-SVM by Tabaan, Alaa Abdulrahman

    Published 2016
    “…The simulation will be carried on WEKA tool, which allows us to call some data mining methods under JAVA environment. The proposed model will be tested and evaluated on both NSL-KDD and KDD-CUP 99 using several performance metrics.…”
    Get full text
    Get full text
    Thesis
  8. 8

    The effect of government policy on the relationship between organizational factors and construction waste management in Abuja, Nigeria by Nasidi, Yusuf

    Published 2016
    “…Further the inadequacy of unified waste management regulations and operational system for the enforcement and control of construction waste management practices among others are accountable for the unsuccessful construction waste management. …”
    Get full text
    Get full text
    Get full text
    Thesis
  9. 9
  10. 10

    Enhanced Heuristic Algorithms with A Vehicle Travel Speed Model for Time-Dependent Vehicle Routing: A Waste Collection Problem by Mat, Nur Azriati, Benjamin, Aida Mauziah, Abdul-Rahman, Syariza

    Published 2018
    “…However, in this paper the static speed that was considered in both algorithms were improved by introducing dynamic travel speeds to construct vehicle routes for the waste collection drivers. …”
    Get full text
    Get full text
    Article
  11. 11

    Enhanced heuristic algorithms with a vehicle travel speed model for time-dependent vehcile routing: A waste collection problem by Mat, Nur Azriati, Benjamin, Aida Mauziah, Abdul-Rahman, Syariza

    Published 2018
    “…This problem is referred to as Time-Dependent Vehicle Routing Problem (TD-VRP) in previous literature.The benchmark problem consisted of ten sub problems, involving up to 2092 customers.Previous studies solved the benchmark problem using DIC and CIS algorithms with the assumption that the vehicles are travelling with a static speed when collecting the waste.However, in this paper the static speed that was considered in both algorithms were improved by introducing dynamic travel speeds to construct vehicle routes for the waste collection drivers. …”
    Get full text
    Get full text
    Get full text
    Article
  12. 12

    A greedy heuristics multiple criteria model for solving multi-landfill site selection and plant propagation algorithm for improving waste collection vehicle routing solutions by Nur Azriati, Mat

    Published 2023
    “…Whereas WCVRP involves, the construction of vehicle routes for collecting waste from customers and discharging their loads at the landfills with the minimum total distance travelled. …”
    Get full text
    Get full text
    Get full text
    Thesis
  13. 13

    Customised fitness function of evolutionary algorithm for optimization of car park space / Ahmad Syahir Ab. Aziz by Ab. Aziz, Ahmad Syahir

    Published 2017
    “…Moreover, the developer must ensure that the parking space is construct with maximum capacity and avoid from waste area. …”
    Get full text
    Get full text
    Thesis
  14. 14

    Nearest greedy for solving the waste collection vehicle routing problem: A case study by Mat, Nur Azriati, Benjamin, Aida Mauziah, Abdul-Rahman, Syariza, Wibowo, Antoni

    Published 2017
    “…This paper presents a real case study pertaining to an issue related to waste collection in the northern part of Malaysia by using a constructive heuristic algorithm known as the Nearest Greedy (NG) technique. …”
    Get full text
    Get full text
    Article
  15. 15

    DeMI interface tool for profit estimation and waste conversion technology recommendations in enhancing municipal solid waste management by Ali, R.A., Nik Ibrahim, N.N.L., Ghani, W.A.W.A.K., Sani, N.S., Lam, H.L.

    Published 2024
    “…The M5P algorithm, adept at profit estimation, establishes correlations between MSW weight and profitability, while the J48 algorithm offers recommendations for suitable waste conversion technologies based on profit potential. …”
    Get full text
    Get full text
    Get full text
    Article
  16. 16

    An improved partial comparison optimization for utilizing landfill facilities in a waste collection vehicle routing problem by Fazlini, Hashim

    Published 2025
    “…The improved PCO incorporates a Nearest Greedy (NG) algorithm for initial solution construction, dynamic parameter adjustment, and two additional neighborhood operators. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  17. 17
  18. 18

    Applying machine learning and particle swarm optimization for predictive modeling and cost optimization in construction project management by almahameed, Bader aldeen, Bisharah, Majdi

    Published 2024
    “…Particle Swarm Optimization (PSO) has demonstrated its efficacy in addressing the issue of construction waste reduction and enhancing the accuracy of cost estimation through the identification of optimal combinations of variables. …”
    Get full text
    Get full text
    Article
  19. 19

    Artificial intelligence in the construction industry / Nurul Najihah Mad Rosni by Mad Rosni, Nurul Najihah

    Published 2023
    “…The ‘old’ construction industry has obvious issues in terms of labour shortage, waste of manpower, delays, and inefficiency in planning, forecasting and budgeting. …”
    Get full text
    Get full text
    Article
  20. 20

    Comparative modelling of strength properties of hydrated-lime activated rice husk-ash (HARHA) modified soft soil for pavement construction purposes by artificial neural network (AN... by Onyelowe, K. C., Alaneme, G. U., Onyia, M. E., Bui Van, D., Dimonyeka, M. U., Nnadi, E., Ogbonna, C., Odum, L. O., Aju, D. E., Abel, C., Udousoro, I. M., Onukwugha, E.

    Published 2021
    “…The problematic clay soil was stabilized with varying proportions of HARHA (stabilizing agent) which is an agricultural waste derivative from the milling of rice ranging from 0% to 12%; the utilization of the alkaline activated wastes encourages its recycling and re-use to obtain sustainable, eco-efficient and eco-friendly engineered infrastructure for use in the construction industry with economic benefits also. …”
    Get full text
    Get full text
    Get full text
    Article