Search Results - (( _ (constructive OR constructing) method algorithm ) OR ( data visualisation using algorithm ))

Refine Results
  1. 1

    Predicting 30-day mortality after an acute coronary syndrome (ACS) using machine learning methods for feature selection, classification and visualization by Nanyonga Aziida, Sorayya Malek, Firdaus Aziz, Khairul Shafiq Ibrahim, Sazzli Kasim

    Published 2021
    “…Hybrid combinations of feature selection, classification and visualisation using machine learning (ML) methods have the potential for enhanced understanding and 30-day mortality prediction of patients with cardiovascular disease using population-specific data. …”
    Get full text
    Get full text
    Get full text
    Article
  2. 2

    Correlation analysis and predictive performance based on KNN and decision tree with augmented reality for nuclear primary cooling process / Ahmad Azhari Mohamad Nor by Mohamad Nor, Ahmad Azhari

    Published 2024
    “…Subsequently, predictive models employing k-nearest neighbour and decision tree algorithms are constructed and evaluated based on accuracy, precision, and recall metrics. …”
    Get full text
    Get full text
    Thesis
  3. 3

    Menu recommendation for Restoran Jannat Saba using Market Basket analysis / Dinie Sorfina Fathanah Kamarul Ariffin by Kamarul Ariffin, Dinie Sorfina Fathanah

    Published 2025
    “…The FP-Growth algorithm has been employed for its effectiveness in identifying frequent itemsets and association rules in transactional data. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Multi-dimensional Data Visualisation using Mobile Augmented Reality by Rehman Ullah, Khan, Yin, Bee Oon, Ahmad Sofian, Shminan, Lee, Jun Choi, Chen, Jacqueline How Ting

    Published 2020
    “…Therefore, this algorithm uses AR to provide a multi-display solution for improved data visualisation after processing, summarising and classifying data. …”
    Get full text
    Get full text
    Get full text
    Article
  5. 5

    Effectiveness of silhouette rendering algorithms in terrain visualisation by Che Mat, Ruzinoor, Visvalingam, Mahes

    Published 2002
    “…Silhouette Rendering Algorithms have been successfully used in various applications such as communicating shape and cartoon rendering.This paper explores how effective silhouette rendering algorithms could be used in terrain visualisation. …”
    Get full text
    Get full text
    Conference or Workshop Item
  6. 6

    An evolutionary based features construction methods for data summarization approach by Rayner Alfred, Suraya Alias, Chin, Kim On

    Published 2015
    “…Here, feature construction methods are applied in order to improve the descriptive accuracy of the DARA algorithm.This research proposes novel feature construction methods, called Variable Length Feature Construction without Substitution (VLFCWOS) and Variable Length Feature Construction with Substitution(VLFCWS), in order to construct a set of relevant features in learning relational data. …”
    Get full text
    Get full text
    Research Report
  7. 7

    Visualisation System of COVID-19 Data in Malaysia by Rehman Ullah, Khan, NOR SYAZA, SYAMIMI, CLADIA SIMBUT, MAMBANG, IVY, THOMAS, TZI NI, WEE

    Published 2021
    “…This study aims to provide a system, using COVID-19 data as a sample to visualise and analyse cases, deaths, discharged ICU cases updates in Malaysia as a whole state wise of COVID-19 daily statistics. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  8. 8

    3D terrain visualisation for GIS: A comparison of different techniques by Ruzinoor, Che Mat, Mohamed Shariff, Abdul Rashid, Mahmud, Ahmad Rodzi, Pradhan, Biswajeet

    Published 2011
    “…The results of this paper will be of help to the users in identifying the best technique of terrain visualisation suitable for GIS data.…”
    Get full text
    Get full text
    Book Section
  9. 9

    Visualisation System of COVID-19 Data in Malaysia by Rehman Ullah, Khan, NOR SYAZA, SYAMIMI, CLADIA SIMBUT, MAMBANG, IVY, THOMAS, NI WEE, TZI

    Published 2021
    “…This study aims to provide a system, using COVID-19 data as a sample to visualise and analyse cases, deaths, discharged ICU cases updates in Malaysia as a whole state wise of COVID-19 daily statistics. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  10. 10

    Ant system-based feature set partitioning algorithm for classifier ensemble construction by Abdullah, , Ku-Mahamud, Ku Ruhana

    Published 2016
    “…Experimental results on several datasets from University of California, Irvine have shown that the proposed algorithm has successfully constructed better classifier ensembles.…”
    Get full text
    Get full text
    Get full text
    Article
  11. 11

    Construction of Cryptographically Strong S-Boxes Inspired by Bee Waggle Dance by Isa H., Jamil N., Z�aba M.R.

    Published 2023
    “…Cryptography; Bee Algorithm; Bee Waggle Dance; Box construction; Power functions; Substitution boxes; Heuristic methods…”
    Article
  12. 12

    Urban green space spatio-temporal change influences on land surface temperature in Kuala Lumpur, Malaysia by Abu Kasim, Junainah

    Published 2020
    “…Accordingly, this study aims to monitor the UGS changes and LST pattern in Kuala Lumpur (KL) for the past six years and to develop an automated prediction model of these scenario for the year 2025 via temporal and spatial variation, using high-resolution aerial imagery data supported by the use of advanced technology mapping. …”
    Get full text
    Get full text
    Thesis
  13. 13

    Optimized feature construction methods for data summarizations of relational data by Sze, Florence Sia Fui

    Published 2014
    “…In this thesis, novel feature construction methods are introduced and a question of whether or not the descriptive accuracy of the summarized data can benefit from the novel feature construction methods is investigated. …”
    Get full text
    Get full text
    Get full text
    Thesis
  14. 14

    Strategies for effective value management practice in construction industry by Zulhkiple, A. Bakar

    Published 2017
    “…The objectives were to develop a new optimisation algorithm and apply the results to control construction project costs. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  15. 15

    Risk assessment for safety and health algorithm for building construction in Oman by Al-Anbari, Saud Said

    Published 2015
    “…Instead, it is suggested that results be verified with an alternative method of assessing risk, such as RASH. In conclusion, RASH is an alternative and effective method for the assessment of safety and health risks in building construction in Oman.…”
    Get full text
    Get full text
    Thesis
  16. 16

    A COMPARISON STUDY OF DATA CLUSTERING AND VISUALISATION TECHNIQUES WITH VARIOUS DATA TYPES by Ling, Chien

    Published 2020
    “…Clustering is used to identify the intrinsic grouping of a set of unlabelled data. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  17. 17

    Sequential constructive algorithm incorporate with fuzzy logic for solving real world course timetabling problem by Tan, Li June, Joe H. Obit, Leau, Yu Beng, Jetol Bolongkikit, Rayner Alfred

    Published 2020
    “…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  18. 18
  19. 19

    Speeding up index construction with GPU for DNA data sequences by Rahmaddiansyah, , Abdul Rashid, Nur’aini

    Published 2011
    “…The advancement of technology in scientific community has produced terabytes of biological data.This datum includes DNA sequences.String matching algorithm which is traditionally used to match DNA sequences now takes much longer time to execute because of the large size of DNA data and also the small number of alphabets.To overcome this problem, the indexing methods such as suffix arrays or suffix trees have been introduced.In this study we used suffix arrays as indexing algorithm because it is more applicable, not complex and used less space compared to suffix trees.The parallel method is then introduced to speed up the index construction process. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  20. 20

    Steep slope DEM model construction based on the unmanned aerial vehicle (UAV) images by Xi, Wenfei, Li, Dongsheng

    Published 2017
    “…Finally, stereo pair splicing method is used to generate orthogonal images and construct DEM model. …”
    Get full text
    Get full text
    Get full text
    Article