Model of leadership characteristics in addressing construction challenges

Failure of construction projects could be attributed from several challenges that emerged along the construction processes. These challenges are categorised as resources allocation, time, cost, quality, safety, project complexity, changes, uncertainties, and communication. It requires several approa...

Full description

Saved in:
Bibliographic Details
Main Author: Ngah Nasaruddin, Nur Ain
Format: Thesis
Language:en
en
en
Published: 2019
Subjects:
Online Access:http://eprints.uthm.edu.my/110/1/24p%20NUR%20AIN%20NGAH%20NASARUDDIN.pdf
http://eprints.uthm.edu.my/110/2/NUR%20AIN%20NGAH%20NASARUDDIN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/110/3/NUR%20AIN%20NGAH%20NASARUDDIN%20WATERMARK.pdf
http://eprints.uthm.edu.my/110/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items