The integrated prediction system for geological conditions ahead of tunnel faces
It is essential to employ the observational design and construction method to manage tunnel projects efficiently.
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
2011
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/25128/1/FP-CH315.pdf http://eprints.usm.my/25128/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!
