The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= http://studentsrepo.um.edu.my/3587/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1831433892640325632 |
|---|---|
| author | Mohd Azrai, Azman |
| author_facet | Mohd Azrai, Azman |
| author_sort | Mohd Azrai, Azman |
| building | UM Library |
| collection | Institutional Repository |
| content_provider | Universiti Malaya |
| content_source | UM Student Repository |
| continent | Asia |
| country | Malaysia |
| format | Thesis |
| id | my.um.stud-3587 |
| institution | Universiti Malaya |
| publishDate | 2012 |
| record_format | eprints |
| spelling | my.um.stud-35872013-08-20T04:17:50Z The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman Mohd Azrai, Azman TH Building construction 2012-08-09 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= Mohd Azrai, Azman (2012) The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/3587/ |
| spellingShingle | TH Building construction Mohd Azrai, Azman The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title | The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title_full | The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title_fullStr | The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title_full_unstemmed | The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title_short | The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
| title_sort | accuracy of preliminary cost estimates in public works department (pwd) of peninsular malaysia / mohd azrai azman |
| topic | TH Building construction |
| url | http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= http://studentsrepo.um.edu.my/3587/ |
| url_provider | http://studentsrepo.um.edu.my/ |
