Kanesan , M., Ishii, H., Mohri, S., & Teruo, M. (2001). Single machine batching problem to minimize the sum of completion times with number of batches and batch size limitations. International Society of Mathematical Sciences.
Chicago Style (17th ed.) CitationKanesan , Muthusamy, Hiroaki Ishii, Shintaro Mohri, and Masuda Teruo. Single Machine Batching Problem to Minimize the Sum of Completion Times with Number of Batches and Batch Size Limitations. International Society of Mathematical Sciences, 2001.
MLA (9th ed.) CitationKanesan , Muthusamy, et al. Single Machine Batching Problem to Minimize the Sum of Completion Times with Number of Batches and Batch Size Limitations. International Society of Mathematical Sciences, 2001.
