Search Results - Beng, T. C.
- Showing 1 - 7 results of 7
-
1
-
2
-
3
Thermal fatigue and corrosion fatigue in heat recovery area wall side tubes by Ahmad J., Purbolaksono J., Beng L.C.
Published 2023Article -
4
Failure analysis on high temperature superheater Inconel� 800 tube by Ahmad J., Purbolaksono J., Beng L.C.
Published 2023Article -
5
Tube failures due to cooling process problem and foreign materials in power plants by Ahmad J., Purbolaksono J., Beng L.C.
Published 2023Article -
6
Failure analysis on a primary superheater tube of a power plant by Purbolaksono J., Ahmad J., Beng L.C., Rashid A.Z., Khinani A., Ali A.A.
Published 2023Article -
7
Failure investigation on rear water wall tube of boiler by Ahmad J., Purbolaksono J., Beng L.C., Rashid A.Z., Khinani A., Ali A.A.
Published 2023Article
