The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)

Now days most of oil fields in Indonesia have been categorized as mature oil field operation and its oil production trend continued to decline. PT. ABC is a multinational oil company that had been operating and managing several oil fields in Indonesia since 50 years ago.The current situation has led...

Full description

Saved in:
Bibliographic Details
Main Author: Sejati, Rahadian Haryo Bayu
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15936/1/P6.pdf
http://repo.uum.edu.my/15936/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items