The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)

Now days most of oil fields in Indonesia have been categorized as mature oil field operation and its oil production trend continued to decline. PT. ABC is a multinational oil company that had been operating and managing several oil fields in Indonesia since 50 years ago.The current situation has led...

Full description

Saved in:
Bibliographic Details
Main Author: Sejati, Rahadian Haryo Bayu
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15936/1/P6.pdf
http://repo.uum.edu.my/15936/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.15936
record_format eprints
spelling my.uum.repo.159362016-04-18T06:52:28Z http://repo.uum.edu.my/15936/ The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field) Sejati, Rahadian Haryo Bayu HD28 Management. Industrial Management Now days most of oil fields in Indonesia have been categorized as mature oil field operation and its oil production trend continued to decline. PT. ABC is a multinational oil company that had been operating and managing several oil fields in Indonesia since 50 years ago.The current situation has led to narrowing the company revenue margin since the lifting cost trend tends to increase while the total oil production declines over time and its major component is the contractor cost.Refer to stakeholder’s voice indicates that the contractor low productivity level occurs by too much workers showing in-effective manpower usage and in-efficient working time.The Integrated Performance Measurement System (IPMS) aimed the company to describe the performance measurement system of contractor workforce productivity in “Mature Oil Field” Operation in the form of business level integration that consists of Business Parent, Business Unit, Business Process and Activities. As the result, 3 (three) Key Performance Indicators (KPI) were determined during IPMS implementation in accordance to properly measure the current productivity level of contractor construction workforce in scattered “X” field as expected by the stakeholders.These Key Performance Indicators (KPI) are; Productive Ratio, Supervision Cost, and Schedule Compliance. These KPI’s are being applied for both Work-Unit Base and Resource-Hour Base Contractors. PT. ABC business process improvement tool of Lean Sigma DMAIC roadmap has been successfully applied to provide statistical data baseline, analytical root cause, generate the improved scenario to achieve metrics as defined and sustain its improved process within the next 12 months of control phase.The total financial benefits claimed is US$ 2.4 MM by improving ~ 43% working time productivity ratio, supervision cost saving by 10% and sustain effective 8 (eight) hours working of resource-hour base contractor.The Integrated Process Measurement System (IPMS) and Lean Sigma collaborative approaches have given a platform of common understanding among the parties and measurement of progress towards readiness for the process improvement deployment as well as to ensure its sustainability. 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/15936/1/P6.pdf Sejati, Rahadian Haryo Bayu (2014) The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field). In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Sejati, Rahadian Haryo Bayu
The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
description Now days most of oil fields in Indonesia have been categorized as mature oil field operation and its oil production trend continued to decline. PT. ABC is a multinational oil company that had been operating and managing several oil fields in Indonesia since 50 years ago.The current situation has led to narrowing the company revenue margin since the lifting cost trend tends to increase while the total oil production declines over time and its major component is the contractor cost.Refer to stakeholder’s voice indicates that the contractor low productivity level occurs by too much workers showing in-effective manpower usage and in-efficient working time.The Integrated Performance Measurement System (IPMS) aimed the company to describe the performance measurement system of contractor workforce productivity in “Mature Oil Field” Operation in the form of business level integration that consists of Business Parent, Business Unit, Business Process and Activities. As the result, 3 (three) Key Performance Indicators (KPI) were determined during IPMS implementation in accordance to properly measure the current productivity level of contractor construction workforce in scattered “X” field as expected by the stakeholders.These Key Performance Indicators (KPI) are; Productive Ratio, Supervision Cost, and Schedule Compliance. These KPI’s are being applied for both Work-Unit Base and Resource-Hour Base Contractors. PT. ABC business process improvement tool of Lean Sigma DMAIC roadmap has been successfully applied to provide statistical data baseline, analytical root cause, generate the improved scenario to achieve metrics as defined and sustain its improved process within the next 12 months of control phase.The total financial benefits claimed is US$ 2.4 MM by improving ~ 43% working time productivity ratio, supervision cost saving by 10% and sustain effective 8 (eight) hours working of resource-hour base contractor.The Integrated Process Measurement System (IPMS) and Lean Sigma collaborative approaches have given a platform of common understanding among the parties and measurement of progress towards readiness for the process improvement deployment as well as to ensure its sustainability.
format Conference or Workshop Item
author Sejati, Rahadian Haryo Bayu
author_facet Sejati, Rahadian Haryo Bayu
author_sort Sejati, Rahadian Haryo Bayu
title The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
title_short The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
title_full The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
title_fullStr The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
title_full_unstemmed The improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (IPMS) and lean sigma process in the "mature oil field" operation (case study: Light oil operation in scattered "X" field)
title_sort improvement of contractor workforce productivity performance through collaborative approaches of the integrated performance measurement system (ipms) and lean sigma process in the "mature oil field" operation (case study: light oil operation in scattered "x" field)
publishDate 2014
url http://repo.uum.edu.my/15936/1/P6.pdf
http://repo.uum.edu.my/15936/
http://stmlportal.net/ictom04/TOC.html
_version_ 1644281838555889664
score 13.1944895