Framework of measurement engineer workload at Public Work Department district of Malaysia

Public Works Department (PWD) serves as a technical agency to the government of Malaysia under Ministry of Works. In carrying out the responsibility in managing the development of Malaysia's infrastructures and public facilities, PWD must effectively and efficiently manages all its resources su...

Full description

Saved in:
Bibliographic Details
Main Author: Awang @ Muda, Mohd. Aswarudin
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/53524/25/MohdAswarudinAwangMFKA2015.pdf
http://eprints.utm.my/id/eprint/53524/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85519
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.53524
record_format eprints
spelling my.utm.535242020-07-19T06:43:04Z http://eprints.utm.my/id/eprint/53524/ Framework of measurement engineer workload at Public Work Department district of Malaysia Awang @ Muda, Mohd. Aswarudin TA Engineering (General). Civil engineering (General) Public Works Department (PWD) serves as a technical agency to the government of Malaysia under Ministry of Works. In carrying out the responsibility in managing the development of Malaysia's infrastructures and public facilities, PWD must effectively and efficiently manages all its resources such as time, cost, manpower and quality of work. In particular, many efforts were undertaken by PWD to improve the quality of project management in the PWD, however there are still some problems in delivering projects on time to clients. One of the main problems is inadequacy of staff, especially engineers to supervise projects and maintenance of government's assets. Therefore, this study aims at identifying the variables influencing engineers' workload at PWD District offices within Peninsular Malaysia. To investigate engineers' workload, a survey is conducted to collect relevant data from engineers working at PWD District offices within Peninsular Malaysia. One of survey findings indicates the most influencing variable is the inadequacy of manpower at district offices. Comprehensive analysis is conducted on collected data and the results are used to determine the ideal mean average number of projects for each engineer at PWD District offices. The average number is derived according to a proposed workload computation program and proposed to be used as a standard number of projects per engineer. This study also proposed recommendations for the top management of PWD to fully utilize existing engineer manpower in order to efficiently supervise the projects especially at PWD District offices. 2015-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/53524/25/MohdAswarudinAwangMFKA2015.pdf Awang @ Muda, Mohd. Aswarudin (2015) Framework of measurement engineer workload at Public Work Department district of Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85519
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Awang @ Muda, Mohd. Aswarudin
Framework of measurement engineer workload at Public Work Department district of Malaysia
description Public Works Department (PWD) serves as a technical agency to the government of Malaysia under Ministry of Works. In carrying out the responsibility in managing the development of Malaysia's infrastructures and public facilities, PWD must effectively and efficiently manages all its resources such as time, cost, manpower and quality of work. In particular, many efforts were undertaken by PWD to improve the quality of project management in the PWD, however there are still some problems in delivering projects on time to clients. One of the main problems is inadequacy of staff, especially engineers to supervise projects and maintenance of government's assets. Therefore, this study aims at identifying the variables influencing engineers' workload at PWD District offices within Peninsular Malaysia. To investigate engineers' workload, a survey is conducted to collect relevant data from engineers working at PWD District offices within Peninsular Malaysia. One of survey findings indicates the most influencing variable is the inadequacy of manpower at district offices. Comprehensive analysis is conducted on collected data and the results are used to determine the ideal mean average number of projects for each engineer at PWD District offices. The average number is derived according to a proposed workload computation program and proposed to be used as a standard number of projects per engineer. This study also proposed recommendations for the top management of PWD to fully utilize existing engineer manpower in order to efficiently supervise the projects especially at PWD District offices.
format Thesis
author Awang @ Muda, Mohd. Aswarudin
author_facet Awang @ Muda, Mohd. Aswarudin
author_sort Awang @ Muda, Mohd. Aswarudin
title Framework of measurement engineer workload at Public Work Department district of Malaysia
title_short Framework of measurement engineer workload at Public Work Department district of Malaysia
title_full Framework of measurement engineer workload at Public Work Department district of Malaysia
title_fullStr Framework of measurement engineer workload at Public Work Department district of Malaysia
title_full_unstemmed Framework of measurement engineer workload at Public Work Department district of Malaysia
title_sort framework of measurement engineer workload at public work department district of malaysia
publishDate 2015
url http://eprints.utm.my/id/eprint/53524/25/MohdAswarudinAwangMFKA2015.pdf
http://eprints.utm.my/id/eprint/53524/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85519
_version_ 1674066175260098560
score 13.1944895