Exploitation of contract document for construction project planning and controlling

Construction industry was plague with multitude of criticism and tribulations in the perspective of the client for cost overruns and delays. The broad-spectrum regions of problems were within the planning and controlling functions. Proper contract documentation between contracting parties within the...

Full description

Saved in:
Bibliographic Details
Main Author: Ali, Aminudin
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/2311/1/AminudinAliMFKA2006.pdf
http://eprints.utm.my/id/eprint/2311/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.2311
record_format eprints
spelling my.utm.23112018-06-25T00:40:31Z http://eprints.utm.my/id/eprint/2311/ Exploitation of contract document for construction project planning and controlling Ali, Aminudin TA Engineering (General). Civil engineering (General) Construction industry was plague with multitude of criticism and tribulations in the perspective of the client for cost overruns and delays. The broad-spectrum regions of problems were within the planning and controlling functions. Proper contract documentation between contracting parties within the planning and controlling functions are able to reduce the predicament. A Document Study was done for 16 numbers of construction contract documentation projects in UTM during the period of the 7th Malaysians’ Plan from 1995 to 2000 with the total value of all projects in the excess RM70 million. The Client, Consultant, and Contractor become the main respondent target. The process of review, analyze and synthesis of contract document reveal 485 verses and phrase related to project planning and controlling functions that is further synthesis into 209 keywords. Time functions were establish to be the most important factor of planning and controlling within the contract document followed by cost function. The usage of contract document identifies construction activity function scored the highest within the content of Construction Drawing and secondly, the construction cost function within the content of Bills of Quantities. The respondent rated the highest score for the contract document to be very important for construction planning and controlling. In general, the contract document is also rated as highly used for construction planning and controlling function. Proposals were made to introduce new Bills of Activities in the contract document using a selected project for the exploitation validation. Microsoft Project 2003 was utilized to simulate the proposal. Finally, for the exploitation of the contract document, 93% of the respondent agreed that the contract document can be modified to become a Master Plan for the construction planning and control function to be contracted in the contract document, legally and binding 2006-07 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/2311/1/AminudinAliMFKA2006.pdf Ali, Aminudin (2006) Exploitation of contract document for construction project planning and controlling. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering : Construction Management.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ali, Aminudin
Exploitation of contract document for construction project planning and controlling
description Construction industry was plague with multitude of criticism and tribulations in the perspective of the client for cost overruns and delays. The broad-spectrum regions of problems were within the planning and controlling functions. Proper contract documentation between contracting parties within the planning and controlling functions are able to reduce the predicament. A Document Study was done for 16 numbers of construction contract documentation projects in UTM during the period of the 7th Malaysians’ Plan from 1995 to 2000 with the total value of all projects in the excess RM70 million. The Client, Consultant, and Contractor become the main respondent target. The process of review, analyze and synthesis of contract document reveal 485 verses and phrase related to project planning and controlling functions that is further synthesis into 209 keywords. Time functions were establish to be the most important factor of planning and controlling within the contract document followed by cost function. The usage of contract document identifies construction activity function scored the highest within the content of Construction Drawing and secondly, the construction cost function within the content of Bills of Quantities. The respondent rated the highest score for the contract document to be very important for construction planning and controlling. In general, the contract document is also rated as highly used for construction planning and controlling function. Proposals were made to introduce new Bills of Activities in the contract document using a selected project for the exploitation validation. Microsoft Project 2003 was utilized to simulate the proposal. Finally, for the exploitation of the contract document, 93% of the respondent agreed that the contract document can be modified to become a Master Plan for the construction planning and control function to be contracted in the contract document, legally and binding
format Thesis
author Ali, Aminudin
author_facet Ali, Aminudin
author_sort Ali, Aminudin
title Exploitation of contract document for construction project planning and controlling
title_short Exploitation of contract document for construction project planning and controlling
title_full Exploitation of contract document for construction project planning and controlling
title_fullStr Exploitation of contract document for construction project planning and controlling
title_full_unstemmed Exploitation of contract document for construction project planning and controlling
title_sort exploitation of contract document for construction project planning and controlling
publishDate 2006
url http://eprints.utm.my/id/eprint/2311/1/AminudinAliMFKA2006.pdf
http://eprints.utm.my/id/eprint/2311/
_version_ 1643643556877828096
score 13.145126