Project risk factors : case study of Ministry of Education projects
Risks are inherent in any projects. A major criticism of the Ministry of Education (MOE) projects undertaken by the Public Works Department (PWD) is the growing rate of delays and cost overrun in project delivery. As reports under the JKR Project Information System, (SKALA JKR), as of September 2008...
Saved in:
Main Author: | Basiron, Anida Suharti@Ami Ronida |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/12687/1/AnidaSuhartiAmiMFKA2009.pdf http://eprints.utm.my/id/eprint/12687/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk management procedures for physical development projects in the Ministry of Education
by: Ahmad Salleh, Mazlina
Published: (2015) -
The privatization projects implemented by Ministry of Defence
by: Ibrahim, Abdul Rahman
Published: (2007) -
Critical delay factors in typical physical projects: the case of the ministry of home affairs in Malaysia.
by: Aminorlah, Aishatul Izwani, et al.
Published: (2023) -
The causes of project delay in the ministry of defence, Malaysia
by: Azhar, Shahrizal
Published: (2019) -
A study of risk factors in civil engineering projects
by: Mohd Muzani bin Mustafa, Mohd Muzani
Published: (2009)