The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry

Small Medium Enterprise (SME) construction organisations are facing very demanding and competitive environment in the construction industry. The demanding and competitiveness of the construction industry required SMEs to be continuously vigilant to current situation and plan to the future. Many of t...

Full description

Saved in:
Bibliographic Details
Main Author: Yahya, Mohd Yamani
Format: Thesis
Language:English
English
English
Published: 2015
Subjects:
Online Access:http://eprints.uthm.edu.my/1576/2/MOHD%20YAMANI%20YAHYA%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1576/1/24p%20MOHD%20YAMANI%20YAHYA.pdf
http://eprints.uthm.edu.my/1576/3/MOHD%20YAMANI%20YAHYA%20WATERMARK.pdf
http://eprints.uthm.edu.my/1576/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.1576
record_format eprints
spelling my.uthm.eprints.15762021-10-03T08:02:55Z http://eprints.uthm.edu.my/1576/ The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry Yahya, Mohd Yamani HD28-70 Management. Industrial Management Small Medium Enterprise (SME) construction organisations are facing very demanding and competitive environment in the construction industry. The demanding and competitiveness of the construction industry required SMEs to be continuously vigilant to current situation and plan to the future. Many of these organisations failed to respond to ever changes environment and some of them were forced to fold their business. These pressures began to force SMEs construction organisation to shift the current short term planning to more strategically planning method such as strategic planning. SME construction organisations should engage in strategic planning activities to enhance their chances of survival and success due to this concept forces organisation to learn and adapt to current environment. Despite high fatality and have only 60 percent of survival rate, many SME construction organisations are reluctant to embrace strategic planning. Therefore, the aim of the study was to develop strategic planning model for guiding SMEs in their future planning. Additionally, the objectives of this research were to identify and investigate the influencing factors and barriers that hinder strategic planning application in SME construction organisations. In satisfying this aim and objective, the research was undertaken in two distinct phases. In phase one, an exploratory study that utilised semi-structured interviews to examine ‘why’ and ‘how’ strategic planning is used in practice by SME construction contractors was undertaken. A total of 22 in-depth interviews were conducted with owners and managers. It was revealed that most firms adopted a myopic and informal approach to strategic planning, with the main barriers to its implementation were plan in owner’s mind, unrealistic, busy, and un-forecast industry. In phase two, the findings from the interviews, in conjunction with the literature, were used to develop series of questions, which were subsequently tested using questionnaire survey. The questionnaire survey gathered quantitative data from a total of 133 SMEs regarding strategic planning practices and the factors that influenced its application. A number of non-parametric statistical techniques were used to analyse the data, which included relative index and factor vii analysis. The influence factors were identified and ranked by using relative index method (RI). The analysis revealed that five (5) variables that were considered the primary influence factors to strategic planning were people, market, technology, project, and financial. In addition, four (4) barriers including managerial, organisational, planning, and industry issues can be obstacle to the effectiveness of the implementation process of strategic planning. Subsequently, the research developed a generic strategic planning model for SMEs and was validated externally by construction industry practitioners. The proposed model provides basic fundamental for the SMEs in the construction industry to engage strategic planning process to enhance their organisation performance. 2015-04 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1576/2/MOHD%20YAMANI%20YAHYA%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1576/1/24p%20MOHD%20YAMANI%20YAHYA.pdf text en http://eprints.uthm.edu.my/1576/3/MOHD%20YAMANI%20YAHYA%20WATERMARK.pdf Yahya, Mohd Yamani (2015) The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
English
English
topic HD28-70 Management. Industrial Management
spellingShingle HD28-70 Management. Industrial Management
Yahya, Mohd Yamani
The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
description Small Medium Enterprise (SME) construction organisations are facing very demanding and competitive environment in the construction industry. The demanding and competitiveness of the construction industry required SMEs to be continuously vigilant to current situation and plan to the future. Many of these organisations failed to respond to ever changes environment and some of them were forced to fold their business. These pressures began to force SMEs construction organisation to shift the current short term planning to more strategically planning method such as strategic planning. SME construction organisations should engage in strategic planning activities to enhance their chances of survival and success due to this concept forces organisation to learn and adapt to current environment. Despite high fatality and have only 60 percent of survival rate, many SME construction organisations are reluctant to embrace strategic planning. Therefore, the aim of the study was to develop strategic planning model for guiding SMEs in their future planning. Additionally, the objectives of this research were to identify and investigate the influencing factors and barriers that hinder strategic planning application in SME construction organisations. In satisfying this aim and objective, the research was undertaken in two distinct phases. In phase one, an exploratory study that utilised semi-structured interviews to examine ‘why’ and ‘how’ strategic planning is used in practice by SME construction contractors was undertaken. A total of 22 in-depth interviews were conducted with owners and managers. It was revealed that most firms adopted a myopic and informal approach to strategic planning, with the main barriers to its implementation were plan in owner’s mind, unrealistic, busy, and un-forecast industry. In phase two, the findings from the interviews, in conjunction with the literature, were used to develop series of questions, which were subsequently tested using questionnaire survey. The questionnaire survey gathered quantitative data from a total of 133 SMEs regarding strategic planning practices and the factors that influenced its application. A number of non-parametric statistical techniques were used to analyse the data, which included relative index and factor vii analysis. The influence factors were identified and ranked by using relative index method (RI). The analysis revealed that five (5) variables that were considered the primary influence factors to strategic planning were people, market, technology, project, and financial. In addition, four (4) barriers including managerial, organisational, planning, and industry issues can be obstacle to the effectiveness of the implementation process of strategic planning. Subsequently, the research developed a generic strategic planning model for SMEs and was validated externally by construction industry practitioners. The proposed model provides basic fundamental for the SMEs in the construction industry to engage strategic planning process to enhance their organisation performance.
format Thesis
author Yahya, Mohd Yamani
author_facet Yahya, Mohd Yamani
author_sort Yahya, Mohd Yamani
title The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
title_short The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
title_full The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
title_fullStr The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
title_full_unstemmed The development of strategic planning concept process model for small medium enterprise (SME) in the construction industry
title_sort development of strategic planning concept process model for small medium enterprise (sme) in the construction industry
publishDate 2015
url http://eprints.uthm.edu.my/1576/2/MOHD%20YAMANI%20YAHYA%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1576/1/24p%20MOHD%20YAMANI%20YAHYA.pdf
http://eprints.uthm.edu.my/1576/3/MOHD%20YAMANI%20YAHYA%20WATERMARK.pdf
http://eprints.uthm.edu.my/1576/
_version_ 1738580877676380160
score 13.145126