Performance Analysis Of Natural Gas Performance Heater For Gas Turbine

Losses in heat exchanger effectiveness has caused increase ni operating cost in Connaught Bridge Power Station. Reducing the actual temperature of the outlet gas would mean a lower efficiency for the gas turbine. A research on the effectiveness improvement method has been performed. Among many of th...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Asyraf Safei
Format: text::Final Year Project
Published: 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items