Technical visit to Pantai Trunk Sewer Tunnel
Link to publisher’s homepage at http://www.myiem.org.my/
Saved in:
Main Author: | Neo, Boon Kheng |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia
2011
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/15665 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Segmental tunnel lining design- understanding ground-Tunnel interactions in staggered tunnel lining
by: Siti Norafida, Jusoh, Dr.
Published: (2018) -
Maintenance of tunnels in Malaysia against good practice / Saiful Adnan Mohamad Idris
by: Mohamad Idris, Saiful Adnan
Published: (2004) -
Advance tunnel alert system / Mohd Shamian Zainal and Danial Md Nor
by: Zainal, Mohd Shamian, et al.
Published: (2006) -
Technical visit to KVMRT Line 2 - V207 mined tunnel site
by: Rini Asnida, Abdullah, Ir. Dr.
Published: (2019) -
Technical site visit to Sungai Besi tunnel
by: Koong, Chong Chi, Ir.
Published: (2019)