Modeling of Production of Injected Plastic Product Using Forecasting, Aggregate Planning and Linear Programming Approach
The project is on production planning of modeling of automotive plastic parts. The focus is on forecasting, aggregate planning and linear programming. The sales data for year 2003 was used as the basis of the planning. Causal forecasting using regression, 3-period moving average, 5-period moving...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2004
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/7939/1/2004%20Bachelor%20-%20Modeling%20Of%20Production%20Of%20Injected%20Plastic%20Product%20Using%20Forecsting%20Aggregate%20Pla.pdf http://utpedia.utp.edu.my/7939/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utp-utpedia.7939 |
---|---|
record_format |
eprints |
spelling |
my-utp-utpedia.79392017-01-25T09:47:07Z http://utpedia.utp.edu.my/7939/ Modeling of Production of Injected Plastic Product Using Forecasting, Aggregate Planning and Linear Programming Approach Dawam, Mohamad Di-Fazley TJ Mechanical engineering and machinery The project is on production planning of modeling of automotive plastic parts. The focus is on forecasting, aggregate planning and linear programming. The sales data for year 2003 was used as the basis of the planning. Causal forecasting using regression, 3-period moving average, 5-period moving average and also exponential smoothing with a = 0.2 and a = 0.5 were used for forecasting models. Results from the forecasting were used to develop for aggregate planning for year 2004. Excel software were used extensively for forecasting, aggregate planning and linear programming. Results from analysis indicate that 3-period moving average provide the best mean absolute deviation (MAD) for the forecasting. While for the case of aggregate planning, constant workforce planning with backorder provides the rrunimum cost. Universiti Teknologi Petronas 2004-05 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/7939/1/2004%20Bachelor%20-%20Modeling%20Of%20Production%20Of%20Injected%20Plastic%20Product%20Using%20Forecsting%20Aggregate%20Pla.pdf Dawam, Mohamad Di-Fazley (2004) Modeling of Production of Injected Plastic Product Using Forecasting, Aggregate Planning and Linear Programming Approach. Universiti Teknologi Petronas. (Unpublished) |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Dawam, Mohamad Di-Fazley Modeling of Production of Injected Plastic Product Using Forecasting, Aggregate Planning and Linear Programming Approach |
description |
The project is on production planning of modeling of automotive plastic parts. The
focus is on forecasting, aggregate planning and linear programming. The sales data
for year 2003 was used as the basis of the planning. Causal forecasting using
regression, 3-period moving average, 5-period moving average and also exponential
smoothing with a = 0.2 and a = 0.5 were used for forecasting models. Results from
the forecasting were used to develop for aggregate planning for year 2004. Excel
software were used extensively for forecasting, aggregate planning and linear
programming. Results from analysis indicate that 3-period moving average provide
the best mean absolute deviation (MAD) for the forecasting. While for the case of
aggregate planning, constant workforce planning with backorder provides the
rrunimum cost. |
format |
Final Year Project |
author |
Dawam, Mohamad Di-Fazley |
author_facet |
Dawam, Mohamad Di-Fazley |
author_sort |
Dawam, Mohamad Di-Fazley |
title |
Modeling of Production of Injected Plastic Product Using Forecasting,
Aggregate Planning and Linear Programming Approach |
title_short |
Modeling of Production of Injected Plastic Product Using Forecasting,
Aggregate Planning and Linear Programming Approach |
title_full |
Modeling of Production of Injected Plastic Product Using Forecasting,
Aggregate Planning and Linear Programming Approach |
title_fullStr |
Modeling of Production of Injected Plastic Product Using Forecasting,
Aggregate Planning and Linear Programming Approach |
title_full_unstemmed |
Modeling of Production of Injected Plastic Product Using Forecasting,
Aggregate Planning and Linear Programming Approach |
title_sort |
modeling of production of injected plastic product using forecasting,
aggregate planning and linear programming approach |
publisher |
Universiti Teknologi Petronas |
publishDate |
2004 |
url |
http://utpedia.utp.edu.my/7939/1/2004%20Bachelor%20-%20Modeling%20Of%20Production%20Of%20Injected%20Plastic%20Product%20Using%20Forecsting%20Aggregate%20Pla.pdf http://utpedia.utp.edu.my/7939/ |
_version_ |
1739831524376707072 |
score |
13.1944895 |