Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine

The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journal...

Full description

Saved in:
Bibliographic Details
Main Authors: Kumar, Pagare Ajay, Neeraj, Kumar
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2022
Online Access:http://journalarticle.ukm.my/20326/1/06.pdf
http://journalarticle.ukm.my/20326/
https://www.ukm.my/jkukm/volume-3404-2022/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.20326
record_format eprints
spelling my-ukm.journal.203262022-11-02T01:10:02Z http://journalarticle.ukm.my/20326/ Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine Kumar, Pagare Ajay Neeraj, Kumar The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journals. The study derives a further framework model comprising three strategies (Supply chain management, inventory management, and maintenance engineering) to improve rate of production. The aforesaid process is used to identify problems that occur during machine breakdown. The paper provides a research substitute machine to manage problems during breakdown of machines so that production is not hindered. Penerbit Universiti Kebangsaan Malaysia 2022 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/20326/1/06.pdf Kumar, Pagare Ajay and Neeraj, Kumar (2022) Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine. Jurnal Kejuruteraan, 34 (4). pp. 585-589. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-3404-2022/
institution Universiti Kebangsaan Malaysia
building Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journals. The study derives a further framework model comprising three strategies (Supply chain management, inventory management, and maintenance engineering) to improve rate of production. The aforesaid process is used to identify problems that occur during machine breakdown. The paper provides a research substitute machine to manage problems during breakdown of machines so that production is not hindered.
format Article
author Kumar, Pagare Ajay
Neeraj, Kumar
spellingShingle Kumar, Pagare Ajay
Neeraj, Kumar
Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
author_facet Kumar, Pagare Ajay
Neeraj, Kumar
author_sort Kumar, Pagare Ajay
title Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_short Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_full Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_fullStr Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_full_unstemmed Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_sort development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2022
url http://journalarticle.ukm.my/20326/1/06.pdf
http://journalarticle.ukm.my/20326/
https://www.ukm.my/jkukm/volume-3404-2022/
_version_ 1748704124922232832
score 13.1944895